CONSTRUCTION METHOD FOR CLEANING MUD IN JACKET STEEL PIPE PILE
A construction method for cleaning mud in a jacket steel pipe pile, comprising: setting up a pile driving auxiliary platform (M1), and performing pile sinking of an underwater steel pipe pile (5); measuring the elevation of a mud surface in the underwater steel pipe pile (5), and calculating the height from the mud surface in the pile to the pile top and the depth required for mud cleaning according to the measurement result; mounting a mud cleaning device (M7) on the steel pipe pile (5); starting the mud cleaning device (M7) to perform a mud cleaning operation, and if the mud cleaning depth is reached, pausing the mud cleaning device (M7) and cleaning the inner wall of the steel pipe pile (5); and if the mud cleaning operation does not reach the designed elevation, repeating the mud cleaning operation until the mud cleaning operation reaches the elevation.
Un procédé de construction pour nettoyer de la boue dans un pilier en tube chemise en acier consiste à : installer une plateforme auxiliaire d'entraînement de pilier (M1), et effectuer un enfoncement de pilier d'un pilier en tube en acier sous-marin (5) ; mesurer l'élévation d'une surface de boue dans le pilier en tube en acier sous-marin (5), et calculer la hauteur à partir de la surface de boue dans le pilier jusqu'au sommet de pilier et la profondeur requise pour le nettoyage de boue en fonction du résultat de mesure ; monter un dispositif de nettoyage de boue (M7) sur le pilier en tube en acier (5) ; démarrer le dispositif de nettoyage de boue (M7) pour effectuer une opération de nettoyage de boue, et si la profondeur de nettoyage de boue est atteinte, mettre en pause le dispositif de nettoyage de boue (M7) et nettoyer la paroi interne du pilier en tube en acier (5) ; et si l'opération de nettoyage de boue n'atteint pas l'élévation désignée, répéter l'opération de nettoyage de boue jusqu'à ce que l'opération de nettoyage de boue atteigne l'élévation.
一种导管架钢管桩桩内清泥施工方法,包括:搭设打桩辅助平台(M1),进行水下钢管桩(5)沉桩;测量水下钢管桩(5)桩内泥面标高,根据测量结果计算桩内泥面距离桩顶的高度以及需要的清泥的深度;于钢管桩(5)上安装清泥设备(M7);启动清泥设备(M7)进行清泥作业,如果达到清泥的深度则暂停清泥设备(M7)并清洗钢管桩(5)内壁;如清泥作业未达到设计标高,则重复上述清泥作业直至达标。
CONSTRUCTION METHOD FOR CLEANING MUD IN JACKET STEEL PIPE PILE
A construction method for cleaning mud in a jacket steel pipe pile, comprising: setting up a pile driving auxiliary platform (M1), and performing pile sinking of an underwater steel pipe pile (5); measuring the elevation of a mud surface in the underwater steel pipe pile (5), and calculating the height from the mud surface in the pile to the pile top and the depth required for mud cleaning according to the measurement result; mounting a mud cleaning device (M7) on the steel pipe pile (5); starting the mud cleaning device (M7) to perform a mud cleaning operation, and if the mud cleaning depth is reached, pausing the mud cleaning device (M7) and cleaning the inner wall of the steel pipe pile (5); and if the mud cleaning operation does not reach the designed elevation, repeating the mud cleaning operation until the mud cleaning operation reaches the elevation.
Un procédé de construction pour nettoyer de la boue dans un pilier en tube chemise en acier consiste à : installer une plateforme auxiliaire d'entraînement de pilier (M1), et effectuer un enfoncement de pilier d'un pilier en tube en acier sous-marin (5) ; mesurer l'élévation d'une surface de boue dans le pilier en tube en acier sous-marin (5), et calculer la hauteur à partir de la surface de boue dans le pilier jusqu'au sommet de pilier et la profondeur requise pour le nettoyage de boue en fonction du résultat de mesure ; monter un dispositif de nettoyage de boue (M7) sur le pilier en tube en acier (5) ; démarrer le dispositif de nettoyage de boue (M7) pour effectuer une opération de nettoyage de boue, et si la profondeur de nettoyage de boue est atteinte, mettre en pause le dispositif de nettoyage de boue (M7) et nettoyer la paroi interne du pilier en tube en acier (5) ; et si l'opération de nettoyage de boue n'atteint pas l'élévation désignée, répéter l'opération de nettoyage de boue jusqu'à ce que l'opération de nettoyage de boue atteigne l'élévation.
一种导管架钢管桩桩内清泥施工方法,包括:搭设打桩辅助平台(M1),进行水下钢管桩(5)沉桩;测量水下钢管桩(5)桩内泥面标高,根据测量结果计算桩内泥面距离桩顶的高度以及需要的清泥的深度;于钢管桩(5)上安装清泥设备(M7);启动清泥设备(M7)进行清泥作业,如果达到清泥的深度则暂停清泥设备(M7)并清洗钢管桩(5)内壁;如清泥作业未达到设计标高,则重复上述清泥作业直至达标。
CONSTRUCTION METHOD FOR CLEANING MUD IN JACKET STEEL PIPE PILE
PROCÉDÉ DE CONSTRUCTION POUR NETTOYER DE LA BOUE DANS UN PILIER EN TUBE CHEMISE EN ACIER
一种导管架钢管桩桩内清泥施工方法
WANG DONGDONG (author) / LIU HUI (author) / WANG DAPENG (author) / WU HAIBING (author) / LV DONGLIANG (author) / SUN XUAN (author) / ZHANG HENG (author)
2023-11-02
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD FOR REMOVING MUD IN JACKET STEEL PIPE PILE
European Patent Office | 2025
|European Patent Office | 2024
|STEEL PIPE PILE JOINT, STEEL PIPE PILE, AND CONSTRUCTION METHOD OF STEEL PIPE PILE
European Patent Office | 2021
|Underwater measurement method for steel pipe pile of jacket foundation by adopting pile-first method
European Patent Office | 2024
|