CONSTRUCTION CONTROL METHOD FOR PARTITION TYPE CONCRETE DIAPHRAGM WALL ANCHORAGE FOUNDATION
Disclosed in the present invention is a construction control method for a partition type concrete diaphragm wall anchorage foundation. The construction control method comprises: step 1, designing a partition type concrete diaphragm wall anchorage foundation structure; step 2, splicing first-stage steel box joints; step 3, constructing first-stage grooves; step 4, mounting the first-stage steel box joints; step 5, visually casting steel box concrete in the first-stage grooves; step 6, constructing second-stage grooves, mounting a second-stage reinforcing cage, and casting concrete to complete second-stage groove section construction; step 7, reinforcing a foundation for the partition type concrete diaphragm wall; and step 8, excavating a foundation pit inside the partition type concrete diaphragm wall, and sequentially carrying out underwater bottom sealing, base plate, core filling body and top plate construction in the foundation pit from bottom to top to complete the construction of the partition type concrete diaphragm wall anchorage foundation. The partition type concrete diaphragm wall anchorage foundation of the present invention has the advantages of both the concrete diaphragm wall anchorage foundation and an open caisson anchorage foundation, and has excellent adaptability to the formation, and the construction control method of the present invention can improve the construction quality of the anchorage foundation and accelerate construction.
La présente invention concerne un procédé de commande de construction pour une fondation d'ancrage à paroi moulée en béton de type cloison. Le procédé de commande de construction comprend : une étape 1 consistant à concevoir une structure de fondation d'ancrage à paroi moulée en béton de type cloison ; une étape 2 consistant à épisser des joints de boîte en acier de premier étage ; une étape 3 consistant à construire des rainures de premier étage ; une étape 4 consistant à monter les joints de boîte en acier de premier étage ; une étape 5 consistant à couler visuellement du béton de boîte en acier dans les rainures de premier étage ; une étape 6 consistant à construire des rainures de second étage, monter une cage de renforcement de second étage, et couler du béton pour achever la construction de section de rainure de second étage ; une étape 7 consistant à renforcer une fondation pour la paroi moulée en béton de type cloison ; et une étape 8 consistant à excaver une fosse de fondation à l'intérieur de la paroi moulée en béton de type cloison, et réaliser séquentiellement une étanchéité inférieure sous-marine, une plaque de base, un corps de remplissage de noyau et une construction de plaque supérieure dans la fosse de fondation de bas en haut pour achever la construction de la fondation d'ancrage de paroi moulée en béton de type cloison. La fondation d'ancrage à paroi moulée en béton de type cloison de la présente invention présente les avantages à la fois de la fondation d'ancrage à paroi moulée en béton et d'une fondation d'ancrage à caisson ouvert, et présente une excellente adaptabilité à la formation, et le procédé de commande de construction de la présente invention permet d'améliorer la qualité de construction de la fondation d'ancrage et d'accélérer la construction.
本发明公开了一种隔仓式地连墙锚碇基础的施工控制方法,包括:步骤一、设计隔仓式地连墙锚碇基础结构;步骤二、拼接一期钢箱接头;步骤三、一期成槽施工;步骤四、安装一期钢箱接头;步骤五、可视化浇筑一期成槽内的钢箱混凝土;步骤六、二期成槽施工、安装二期钢筋笼、浇筑混凝土,完成二期槽段施工;步骤七、隔仓式地连墙的地基加固施工;步骤八、隔仓式地连墙内部基坑的开挖施工,在基坑内从下至上依次进行水下封底、底板、填芯体、顶板的施工,完成隔仓式地连墙锚碇基础的施工。本发明的隔仓式地连墙锚碇基础同时具备地连墙锚碇基础和沉井锚碇基础的优点,地层适应性好,且本发明的施工控制方法可以提高锚碇基础的施工质量、加快施工速度。
CONSTRUCTION CONTROL METHOD FOR PARTITION TYPE CONCRETE DIAPHRAGM WALL ANCHORAGE FOUNDATION
Disclosed in the present invention is a construction control method for a partition type concrete diaphragm wall anchorage foundation. The construction control method comprises: step 1, designing a partition type concrete diaphragm wall anchorage foundation structure; step 2, splicing first-stage steel box joints; step 3, constructing first-stage grooves; step 4, mounting the first-stage steel box joints; step 5, visually casting steel box concrete in the first-stage grooves; step 6, constructing second-stage grooves, mounting a second-stage reinforcing cage, and casting concrete to complete second-stage groove section construction; step 7, reinforcing a foundation for the partition type concrete diaphragm wall; and step 8, excavating a foundation pit inside the partition type concrete diaphragm wall, and sequentially carrying out underwater bottom sealing, base plate, core filling body and top plate construction in the foundation pit from bottom to top to complete the construction of the partition type concrete diaphragm wall anchorage foundation. The partition type concrete diaphragm wall anchorage foundation of the present invention has the advantages of both the concrete diaphragm wall anchorage foundation and an open caisson anchorage foundation, and has excellent adaptability to the formation, and the construction control method of the present invention can improve the construction quality of the anchorage foundation and accelerate construction.
La présente invention concerne un procédé de commande de construction pour une fondation d'ancrage à paroi moulée en béton de type cloison. Le procédé de commande de construction comprend : une étape 1 consistant à concevoir une structure de fondation d'ancrage à paroi moulée en béton de type cloison ; une étape 2 consistant à épisser des joints de boîte en acier de premier étage ; une étape 3 consistant à construire des rainures de premier étage ; une étape 4 consistant à monter les joints de boîte en acier de premier étage ; une étape 5 consistant à couler visuellement du béton de boîte en acier dans les rainures de premier étage ; une étape 6 consistant à construire des rainures de second étage, monter une cage de renforcement de second étage, et couler du béton pour achever la construction de section de rainure de second étage ; une étape 7 consistant à renforcer une fondation pour la paroi moulée en béton de type cloison ; et une étape 8 consistant à excaver une fosse de fondation à l'intérieur de la paroi moulée en béton de type cloison, et réaliser séquentiellement une étanchéité inférieure sous-marine, une plaque de base, un corps de remplissage de noyau et une construction de plaque supérieure dans la fosse de fondation de bas en haut pour achever la construction de la fondation d'ancrage de paroi moulée en béton de type cloison. La fondation d'ancrage à paroi moulée en béton de type cloison de la présente invention présente les avantages à la fois de la fondation d'ancrage à paroi moulée en béton et d'une fondation d'ancrage à caisson ouvert, et présente une excellente adaptabilité à la formation, et le procédé de commande de construction de la présente invention permet d'améliorer la qualité de construction de la fondation d'ancrage et d'accélérer la construction.
本发明公开了一种隔仓式地连墙锚碇基础的施工控制方法,包括:步骤一、设计隔仓式地连墙锚碇基础结构;步骤二、拼接一期钢箱接头;步骤三、一期成槽施工;步骤四、安装一期钢箱接头;步骤五、可视化浇筑一期成槽内的钢箱混凝土;步骤六、二期成槽施工、安装二期钢筋笼、浇筑混凝土,完成二期槽段施工;步骤七、隔仓式地连墙的地基加固施工;步骤八、隔仓式地连墙内部基坑的开挖施工,在基坑内从下至上依次进行水下封底、底板、填芯体、顶板的施工,完成隔仓式地连墙锚碇基础的施工。本发明的隔仓式地连墙锚碇基础同时具备地连墙锚碇基础和沉井锚碇基础的优点,地层适应性好,且本发明的施工控制方法可以提高锚碇基础的施工质量、加快施工速度。
CONSTRUCTION CONTROL METHOD FOR PARTITION TYPE CONCRETE DIAPHRAGM WALL ANCHORAGE FOUNDATION
PROCÉDÉ DE COMMANDE DE CONSTRUCTION POUR FONDATION D'ANCRAGE À PAROI MOULÉE EN BÉTON DE TYPE CLOISON
隔仓式地连墙锚碇基础的施工控制方法
YANG ZHAO (author) / CHEN PEISHUAI (author) / RAO WEISHENG (author) / JI FUQUAN (author) / LIU PENGFEI (author) / LI DEJIE (author) / MA CHAO (author) / WANG XINLONG (author) / HE ZUHAO (author) / ZHU JUNTAO (author)
2024-01-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Underground diaphragm wall anchorage foundation and construction method thereof
European Patent Office | 2024
|European Patent Office | 2024
|Suspension bridge anchorage diaphragm wall foundation and construction method thereof
European Patent Office | 2024
|