The present application provides a construction method for a water body replacement type storage yard. The construction method comprises: the construction of a water-stopping cofferdam; enclosure drainage construction: after the water-stopping cofferdam is closed, draining water in the enclosed range of the water-stopping cofferdam to expose a pit body, so as to create dry construction conditions; the construction of a stacking yard: constructing the stacking yard on the pit body under the dry construction conditions, which comprises: constructing a lower low-level floor and a higher high-level floor, wherein the low-level floor is lower than an average water level on an outer side of the water-stopping cofferdam, and the high-level floor can be used for the traveling of a stacker-reclaimer apparatus, which can convey materials into or away from a warehouse body; and the construction of the warehouse body: constructing the warehouse body on the low-level floor.
La présente demande concerne un procédé de construction pour une aire de stockage de type à remplacement de masse d'eau. Le procédé de construction consiste à : construire un batardeau d'arrêt d'eau ; construire un drainage d'enceinte : après la fermeture du batardeau d'arrêt d'eau, drainer l'eau dans la plage fermée du batardeau d'arrêt d'eau pour exposer un corps de fosse de façon à créer des conditions de construction sèche ; construire une aire d'empilement : construire l'aire d'empilement sur le corps de fosse dans les conditions de construction sèche, ce qui consiste à : construire un plancher inférieur niveau bas et un plancher supérieur niveau haut, le plancher inférieur niveau bas étant plus bas qu'un niveau d'eau moyen sur un côté externe du batardeau d'arrêt d'eau, et le plancher niveau haut pouvant être utilisé pour déplacer un appareil empileur-récupérateur qui peut transporter des matériaux dans un corps d'entrepôt ou hors de celui-ci ; et construire le corps d'entrepôt : construire le corps d'entrepôt sur le plancher niveau bas.
本申请提供一种水体置换式储存场施工方法,包括:止水围埝的构筑;围蔽排水施工:止水围埝合龙封闭后,排除其围蔽范围内的水,露出坑体,形成干施工条件;堆场的施工:在干施工条件下,在所述坑体上进行堆场施工,包括构筑较低的低位地坪和较高的高位地坪;所述低位地坪低于所述止水围埝外侧的平均水位;所述高位地坪能够用于堆取料设备的行走,所述堆取料设备能够给仓体输送物料或从仓体输出物料;以及仓体的施工:所述仓体在所述低位地坪上构筑而成。
CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
The present application provides a construction method for a water body replacement type storage yard. The construction method comprises: the construction of a water-stopping cofferdam; enclosure drainage construction: after the water-stopping cofferdam is closed, draining water in the enclosed range of the water-stopping cofferdam to expose a pit body, so as to create dry construction conditions; the construction of a stacking yard: constructing the stacking yard on the pit body under the dry construction conditions, which comprises: constructing a lower low-level floor and a higher high-level floor, wherein the low-level floor is lower than an average water level on an outer side of the water-stopping cofferdam, and the high-level floor can be used for the traveling of a stacker-reclaimer apparatus, which can convey materials into or away from a warehouse body; and the construction of the warehouse body: constructing the warehouse body on the low-level floor.
La présente demande concerne un procédé de construction pour une aire de stockage de type à remplacement de masse d'eau. Le procédé de construction consiste à : construire un batardeau d'arrêt d'eau ; construire un drainage d'enceinte : après la fermeture du batardeau d'arrêt d'eau, drainer l'eau dans la plage fermée du batardeau d'arrêt d'eau pour exposer un corps de fosse de façon à créer des conditions de construction sèche ; construire une aire d'empilement : construire l'aire d'empilement sur le corps de fosse dans les conditions de construction sèche, ce qui consiste à : construire un plancher inférieur niveau bas et un plancher supérieur niveau haut, le plancher inférieur niveau bas étant plus bas qu'un niveau d'eau moyen sur un côté externe du batardeau d'arrêt d'eau, et le plancher niveau haut pouvant être utilisé pour déplacer un appareil empileur-récupérateur qui peut transporter des matériaux dans un corps d'entrepôt ou hors de celui-ci ; et construire le corps d'entrepôt : construire le corps d'entrepôt sur le plancher niveau bas.
本申请提供一种水体置换式储存场施工方法,包括:止水围埝的构筑;围蔽排水施工:止水围埝合龙封闭后,排除其围蔽范围内的水,露出坑体,形成干施工条件;堆场的施工:在干施工条件下,在所述坑体上进行堆场施工,包括构筑较低的低位地坪和较高的高位地坪;所述低位地坪低于所述止水围埝外侧的平均水位;所述高位地坪能够用于堆取料设备的行走,所述堆取料设备能够给仓体输送物料或从仓体输出物料;以及仓体的施工:所述仓体在所述低位地坪上构筑而成。
CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
PROCÉDÉ DE CONSTRUCTION POUR AIRE DE STOCKAGE DE TYPE À REMPLACEMENT DE MASSE D'EAU, ET AIRE DE STOCKAGE
水体置换式储存场施工方法及储存场
PAN WEI (author) / LI YIYONG (author) / LI ZENGJUN (author) / MENG FANLI (author) / ZHANG NAISHOU (author) / HOU JINFANG (author) / DU CHUANG (author)
2024-02-15
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
European Patent Office | 2025
|Water body replacement type storage yard and application
European Patent Office | 2023
|Cement storage in construction yard
Engineering Index Backfile | 1948
|European Patent Office | 2023
|