A platform for research: civil engineering, architecture and urbanism
DECK CABLE AND STABILIZING CABLE ANCHORING SYSTEM FOR CABLEWAY BRIDGE, AND CONSTRUCTION METHOD
The present invention belongs to the technical field of bridge design and construction, and particularly relates to a deck cable and stabilizing cable anchoring system for a cableway bridge, and a construction method. The deck cable and stabilizing cable anchoring system for a cableway bridge comprises a cable rotating saddle, a cable rotating saddle foundation beam, a balance beam, tail end concrete, an anchor cable, a deck cable and a stabilizing cable, wherein the cable rotating saddle comprises stabilizing cable rotating saddles and a deck cable rotating saddle, the deck cable rotating saddle being arranged in the middle of the top of the cable rotating saddle foundation beam, the stabilizing cable rotating saddles are arranged on two sides of the cable rotating saddle foundation beam, the deck cable passing through the deck cable rotating saddle to be anchored to a rear anchor surface of the balance beam, the stabilizing cable passing through the stabilizing cable rotating saddle to be anchored to the rear anchor surface of the balance beam, the anchor cable being anchored to a front anchor surface of the balance beam at one end, and is anchored in rock mass on a bank of the cableway bridge at the other end. According to the present invention, the balance beam is used as a conversion structure for transmitting cable forces from the deck cable and the stabilizing cable to an anchor cable system, the anchoring system for a cableway bridge has high safety, good economical viability and good durability, and the deck cable, the stabilizing cable and the anchor cable are easier to tension in a construction stage and to replace later.
La présente invention appartient au domaine technique de la conception et de la construction de ponts, et concerne en particulier un système d'ancrage de câbles de tablier et de câbles de stabilisation pour un pont suspendu et un procédé de construction. Le système d'ancrage de câbles de tablier et de câbles de stabilisation pour pont suspendu comprend une selle rotative de câble, une poutre de fondation de selle rotative de câble, une poutre d'équilibre, une partie arrière en béton, un câble d'ancrage, un câble de tablier et un câble de stabilisation, la selle rotative de câble comprenant des selles rotatives de câble de stabilisation et une selle rotative de câble de tablier, la selle rotative de câble de tablier étant disposée au milieu de la partie supérieure de la poutre de fondation de selle rotative de câble, les selles rotatives de câble de stabilisation sont disposées sur les deux cotés de la poutre de fondation de selle rotative de câble, le câble de tablier passant à travers la selle rotative de câble de tablier à ancrer sur une surface d'ancrage arrière de la poutre d'équilibre, le câble de stabilisation passant à travers la selle rotative de câble de stabilisation à ancrer sur la surface d'ancrage arrière de la poutre d'équilibre, le câble d'ancrage étant ancré dans une surface d'ancrage avant de la poutre d'équilibre à une extrémité, et étant ancré dans la masse rocheuse d'une rive du pont suspendu à l'autre extrémité. Selon la présente invention, la poutre d'équilibre est utilisée en tant que structure de conversion pour transmettre les forces de câble à partir du câble de tablier et du câble de stabilisation à un système de câble d'ancrage, le système d'ancrage pour pont suspendu a une sécurité élevée, une bonne viabilité économique et une bonne durabilité, et le câble de tablier, le câble de stabilisation et le câble d'ancrage sont plus faciles à mettre sous tension dans une étape de construction et à remplacer ultérieurement.
本发明属于桥梁设计与施工技术领域,特别涉及一种索道桥桥面索和稳定索锚固系统及施工方法。一种索道桥桥面索和稳定索锚固系统,包括转索鞍、转索鞍地基梁、平衡梁、尾端混凝土、锚索、桥面索、稳定索,转索鞍包括稳定索转索鞍、桥面索转索鞍,转索鞍地基梁顶部中间设置有桥面索转索鞍,两侧设置有稳定索转索鞍,桥面索穿过桥面索转索鞍与平衡梁的后锚面锚固,稳定索穿过稳定索转索鞍与平衡梁的后锚面锚固,锚索一端与平衡梁的前锚面锚固,一端锚固在索道桥岸边岩体内。本发明采用平衡梁为将桥面索和稳定索索力传递给锚索体系的转换结构,索道桥锚固系统安全性高、经济性强、耐久性更好,桥面索、稳定索及锚索的施工阶段张拉及后期更换更为方便。
DECK CABLE AND STABILIZING CABLE ANCHORING SYSTEM FOR CABLEWAY BRIDGE, AND CONSTRUCTION METHOD
The present invention belongs to the technical field of bridge design and construction, and particularly relates to a deck cable and stabilizing cable anchoring system for a cableway bridge, and a construction method. The deck cable and stabilizing cable anchoring system for a cableway bridge comprises a cable rotating saddle, a cable rotating saddle foundation beam, a balance beam, tail end concrete, an anchor cable, a deck cable and a stabilizing cable, wherein the cable rotating saddle comprises stabilizing cable rotating saddles and a deck cable rotating saddle, the deck cable rotating saddle being arranged in the middle of the top of the cable rotating saddle foundation beam, the stabilizing cable rotating saddles are arranged on two sides of the cable rotating saddle foundation beam, the deck cable passing through the deck cable rotating saddle to be anchored to a rear anchor surface of the balance beam, the stabilizing cable passing through the stabilizing cable rotating saddle to be anchored to the rear anchor surface of the balance beam, the anchor cable being anchored to a front anchor surface of the balance beam at one end, and is anchored in rock mass on a bank of the cableway bridge at the other end. According to the present invention, the balance beam is used as a conversion structure for transmitting cable forces from the deck cable and the stabilizing cable to an anchor cable system, the anchoring system for a cableway bridge has high safety, good economical viability and good durability, and the deck cable, the stabilizing cable and the anchor cable are easier to tension in a construction stage and to replace later.
La présente invention appartient au domaine technique de la conception et de la construction de ponts, et concerne en particulier un système d'ancrage de câbles de tablier et de câbles de stabilisation pour un pont suspendu et un procédé de construction. Le système d'ancrage de câbles de tablier et de câbles de stabilisation pour pont suspendu comprend une selle rotative de câble, une poutre de fondation de selle rotative de câble, une poutre d'équilibre, une partie arrière en béton, un câble d'ancrage, un câble de tablier et un câble de stabilisation, la selle rotative de câble comprenant des selles rotatives de câble de stabilisation et une selle rotative de câble de tablier, la selle rotative de câble de tablier étant disposée au milieu de la partie supérieure de la poutre de fondation de selle rotative de câble, les selles rotatives de câble de stabilisation sont disposées sur les deux cotés de la poutre de fondation de selle rotative de câble, le câble de tablier passant à travers la selle rotative de câble de tablier à ancrer sur une surface d'ancrage arrière de la poutre d'équilibre, le câble de stabilisation passant à travers la selle rotative de câble de stabilisation à ancrer sur la surface d'ancrage arrière de la poutre d'équilibre, le câble d'ancrage étant ancré dans une surface d'ancrage avant de la poutre d'équilibre à une extrémité, et étant ancré dans la masse rocheuse d'une rive du pont suspendu à l'autre extrémité. Selon la présente invention, la poutre d'équilibre est utilisée en tant que structure de conversion pour transmettre les forces de câble à partir du câble de tablier et du câble de stabilisation à un système de câble d'ancrage, le système d'ancrage pour pont suspendu a une sécurité élevée, une bonne viabilité économique et une bonne durabilité, et le câble de tablier, le câble de stabilisation et le câble d'ancrage sont plus faciles à mettre sous tension dans une étape de construction et à remplacer ultérieurement.
本发明属于桥梁设计与施工技术领域,特别涉及一种索道桥桥面索和稳定索锚固系统及施工方法。一种索道桥桥面索和稳定索锚固系统,包括转索鞍、转索鞍地基梁、平衡梁、尾端混凝土、锚索、桥面索、稳定索,转索鞍包括稳定索转索鞍、桥面索转索鞍,转索鞍地基梁顶部中间设置有桥面索转索鞍,两侧设置有稳定索转索鞍,桥面索穿过桥面索转索鞍与平衡梁的后锚面锚固,稳定索穿过稳定索转索鞍与平衡梁的后锚面锚固,锚索一端与平衡梁的前锚面锚固,一端锚固在索道桥岸边岩体内。本发明采用平衡梁为将桥面索和稳定索索力传递给锚索体系的转换结构,索道桥锚固系统安全性高、经济性强、耐久性更好,桥面索、稳定索及锚索的施工阶段张拉及后期更换更为方便。
DECK CABLE AND STABILIZING CABLE ANCHORING SYSTEM FOR CABLEWAY BRIDGE, AND CONSTRUCTION METHOD
SYSTÈME D'ANCRAGE DE CÂBLES DE TABLIER ET DE CÂBLES DE STABILISATION POUR PONT SUSPENDU ET PROCÉDÉ DE CONSTRUCTION
一种索道桥桥面索和稳定索锚固系统及施工方法
DU JUNBO (author) / YANG PING (author) / LIU XINHUA (author) / LIU ZHENGJUN (author) / KANG JINGANG (author) / WANG HONGRU (author) / WANG ZHIPENG (author)
2024-02-22
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Cableway bridge deck cable and stabilizing cable anchoring system and construction method
European Patent Office | 2023
|Analysis on Construction Control about Main Cable System of Cableway Bridge
British Library Conference Proceedings | 2015
|European Patent Office | 2021
|