A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION EQUIPMENT WITH ADVANCED POWER MANAGEMENT FUNCTIONS
A control unit (110) for controlling power consumption by construction equipment (100) powered at least partly via an electrical mains cable connection (160), where the control unit (110) is arranged to obtain data indicative of a current drawn by the construction equipment (100) as function of time, where the control unit (110) is arranged to process the obtained data using at least a first and a second averaging function, where the first averaging function is associated with a shorter averaging time window compared to the second function, where the outputs of the at least two functions are associated with respective function acceptance criteria, where the control unit (110) is arranged to limit the current drawn by the construction equipment (100) in case any of the function outputs does not meet the respective function acceptance criterion.
L'invention concerne une unité de commande (110) permettant de commander la consommation d'énergie au moyen d'un équipement de construction (100) alimenté au moins partiellement par l'intermédiaire d'une connexion de câble de réseau électrique (160). L'unité de commande (110) est conçue pour obtenir des données indicatives d'un courant consommé par l'équipement de construction (100) en fonction du temps, et conçue pour traiter les données obtenues à l'aide d'au moins une première et une seconde fonction de moyennage. La première fonction de moyennage est associée à une fenêtre temporelle de moyenne plus courte par rapport à la seconde fonction, les sorties des au moins deux fonctions étant associées à des critères d'acceptation de fonction respectifs. L'unité de commande (110) est en outre conçue pour limiter le courant consommé par l'équipement de construction (100) dans le cas où l'une quelconque des sorties de fonction ne satisfait pas le critère d'acceptation de fonction respectif.
CONSTRUCTION EQUIPMENT WITH ADVANCED POWER MANAGEMENT FUNCTIONS
A control unit (110) for controlling power consumption by construction equipment (100) powered at least partly via an electrical mains cable connection (160), where the control unit (110) is arranged to obtain data indicative of a current drawn by the construction equipment (100) as function of time, where the control unit (110) is arranged to process the obtained data using at least a first and a second averaging function, where the first averaging function is associated with a shorter averaging time window compared to the second function, where the outputs of the at least two functions are associated with respective function acceptance criteria, where the control unit (110) is arranged to limit the current drawn by the construction equipment (100) in case any of the function outputs does not meet the respective function acceptance criterion.
L'invention concerne une unité de commande (110) permettant de commander la consommation d'énergie au moyen d'un équipement de construction (100) alimenté au moins partiellement par l'intermédiaire d'une connexion de câble de réseau électrique (160). L'unité de commande (110) est conçue pour obtenir des données indicatives d'un courant consommé par l'équipement de construction (100) en fonction du temps, et conçue pour traiter les données obtenues à l'aide d'au moins une première et une seconde fonction de moyennage. La première fonction de moyennage est associée à une fenêtre temporelle de moyenne plus courte par rapport à la seconde fonction, les sorties des au moins deux fonctions étant associées à des critères d'acceptation de fonction respectifs. L'unité de commande (110) est en outre conçue pour limiter le courant consommé par l'équipement de construction (100) dans le cas où l'une quelconque des sorties de fonction ne satisfait pas le critère d'acceptation de fonction respectif.
CONSTRUCTION EQUIPMENT WITH ADVANCED POWER MANAGEMENT FUNCTIONS
ÉQUIPEMENT DE CONSTRUCTION À FONCTIONS DE GESTION DE PUISSANCE AVANCÉES
OLSSON TOMMY (author)
2024-04-04
Patent
Electronic Resource
English
IPC:
E02F
Baggern
,
DREDGING
Advanced Construction Technology Research Equipment
NTIS | 1992
|Management System Construction and its Functions Analysis for Vehicle Equipment CBM
British Library Conference Proceedings | 2012
|Advanced construction management information systems
British Library Conference Proceedings | 1994
|Integration of construction management functions
British Library Conference Proceedings | 1999
|