A platform for research: civil engineering, architecture and urbanism
SUPER-LONG PREFABRICATED LARGE-DIAMETER PIPE PILE, MANUFACTURING METHOD THEREFOR AND USE THEREOF
A super-long prefabricated large-diameter pipe pile, a manufacturing method therefor and a use thereof, relating to the technical field of concrete steel pipe piles. The super-long prefabricated large-diameter pipe pile comprises the following raw materials: a pipe segment raw material, comprising C70 concrete of stiff consistency and a steel reinforcement cage, wherein the C70 concrete of stiff consistency comprises water, cement, sand, aggregate, and an admixture; and a grouting material for pipe segment assembly, comprising cement, an admixture, an expanding agent, and water, wherein the grouting material is an M50 grouting material. C60-grade concrete and an M40 grouting material which are originally used are respectively upgraded to the C70-grade concrete and the M50 grouting material, thereby improving the comprehensive performance such as the hammering resistance of the prefabricated large-diameter pipe pile and the bending resistance of the large-diameter pipe pile.
L'invention concerne un pieu tubulaire préfabriqué de grand diamètre et de grande longueur, son procédé de fabrication et son utilisation, se rapportant au domaine technique des pieux tubulaires en béton armé. Le pieu tubulaire préfabriqué de grand diamètre et de grande longueur comprend les matières premières suivantes : une matière première de segment de tuyau, comprenant du béton C70 de consistance rigide et une armature de renforcement en acier, le béton C70 de consistance rigide comprenant de l'eau, du ciment, du sable, un agrégat et un mélange ; et un matériau de jointoiement pour ensemble de segment de tuyau, comprenant du ciment, un mélange, un agent d'expansion et de l'eau, le matériau de jointoiement étant un matériau de jointoiement M50. Du béton de qualité C60 et un matériau de jointoiement M40 qui sont utilisés à l'origine sont respectivement valorisés au béton de qualité C70 et au matériau de jointoiement M50, ce qui permet d'améliorer les performances globales telles que la résistance au battage du pieu tubulaire préfabriqué de grand diamètre et la résistance à la flexion du pieu tubulaire de grand diamètre.
一种超长预制大管桩、超长预制大管桩的制备方法及应用,属于混凝土钢管桩技术领域,超长预制大管桩,包括以下原料:管节原料,所述管节原料包括 C70干硬性混凝土和钢筋笼,所述 C70 干硬性混凝土包括水、水泥、砂、骨料以及外加剂;管节拼接中的灌浆料,所述灌浆料包括水泥、外加剂、膨胀剂以及水,所述灌浆料为M50灌浆料。将原 C60 等级混凝土和M40 灌浆料分别提高到C70等级混凝土和M50灌浆料,以提高预制大管桩的抗锤击性能和大管桩的抗弯能力等综合性能。
SUPER-LONG PREFABRICATED LARGE-DIAMETER PIPE PILE, MANUFACTURING METHOD THEREFOR AND USE THEREOF
A super-long prefabricated large-diameter pipe pile, a manufacturing method therefor and a use thereof, relating to the technical field of concrete steel pipe piles. The super-long prefabricated large-diameter pipe pile comprises the following raw materials: a pipe segment raw material, comprising C70 concrete of stiff consistency and a steel reinforcement cage, wherein the C70 concrete of stiff consistency comprises water, cement, sand, aggregate, and an admixture; and a grouting material for pipe segment assembly, comprising cement, an admixture, an expanding agent, and water, wherein the grouting material is an M50 grouting material. C60-grade concrete and an M40 grouting material which are originally used are respectively upgraded to the C70-grade concrete and the M50 grouting material, thereby improving the comprehensive performance such as the hammering resistance of the prefabricated large-diameter pipe pile and the bending resistance of the large-diameter pipe pile.
L'invention concerne un pieu tubulaire préfabriqué de grand diamètre et de grande longueur, son procédé de fabrication et son utilisation, se rapportant au domaine technique des pieux tubulaires en béton armé. Le pieu tubulaire préfabriqué de grand diamètre et de grande longueur comprend les matières premières suivantes : une matière première de segment de tuyau, comprenant du béton C70 de consistance rigide et une armature de renforcement en acier, le béton C70 de consistance rigide comprenant de l'eau, du ciment, du sable, un agrégat et un mélange ; et un matériau de jointoiement pour ensemble de segment de tuyau, comprenant du ciment, un mélange, un agent d'expansion et de l'eau, le matériau de jointoiement étant un matériau de jointoiement M50. Du béton de qualité C60 et un matériau de jointoiement M40 qui sont utilisés à l'origine sont respectivement valorisés au béton de qualité C70 et au matériau de jointoiement M50, ce qui permet d'améliorer les performances globales telles que la résistance au battage du pieu tubulaire préfabriqué de grand diamètre et la résistance à la flexion du pieu tubulaire de grand diamètre.
一种超长预制大管桩、超长预制大管桩的制备方法及应用,属于混凝土钢管桩技术领域,超长预制大管桩,包括以下原料:管节原料,所述管节原料包括 C70干硬性混凝土和钢筋笼,所述 C70 干硬性混凝土包括水、水泥、砂、骨料以及外加剂;管节拼接中的灌浆料,所述灌浆料包括水泥、外加剂、膨胀剂以及水,所述灌浆料为M50灌浆料。将原 C60 等级混凝土和M40 灌浆料分别提高到C70等级混凝土和M50灌浆料,以提高预制大管桩的抗锤击性能和大管桩的抗弯能力等综合性能。
SUPER-LONG PREFABRICATED LARGE-DIAMETER PIPE PILE, MANUFACTURING METHOD THEREFOR AND USE THEREOF
PIEU TUBULAIRE PRÉFABRIQUÉ DE GRAND DIAMÈTRE ET DE GRANDE LONGUEUR, SON PROCÉDÉ DE FABRICATION ET SON UTILISATION
超长预制大管桩、超长预制大管桩的制备方法及应用
PAN GENQIANG (author) / LIN DONG (author) / GAO JIHONG (author) / ZHANG YINBING (author) / WANG YU AN (author) / GAO HONGYAN (author) / HUANG YANHUI (author)
2024-06-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
C04B
Kalk
,
LIME
European Patent Office | 2023
|Large-diameter prefabricated pipe pile construction method under complex geology
European Patent Office | 2022
|Prefabricated pipe pile and manufacturing process thereof
European Patent Office | 2023
|CONSTRUCTION METHOD FOR FOUNDATION PIT SUPPORT UTILIZING PREFABRICATED LARGE-DIAMETER PIPE PILE
European Patent Office | 2021
|Method for manufacturing and constructing large-diameter super-long test pile
European Patent Office | 2015
|