A platform for research: civil engineering, architecture and urbanism
INTELLIGENT GROUTING CONSTRUCTION METHOD AND CONSTRUCTION APPARATUS FOR BUILDING RAFT FOUNDATION
Particularly disclosed in the present invention are an intelligent grouting construction method and construction apparatus for a building raft foundation. The construction method comprises: making grouting pipes penetrate a soil body to be reinforced; injecting a cutting fluid into said soil body by means of the grouting pipes, so as to cut said soil body to form a slurry pumping area; pumping away sand and gravel slurry generated in the slurry pumping area; and injecting grout into the slurry pumping area by means of the grouting pipes while performing slurry pumping, so as to form a reinforced body after the grout solidifies in the slurry pumping area. The whole process is monitored by sensors and geophysical prospecting devices, and a power device and grouting holes are controlled to be constructed according to design requirements, such that the present invention has an artificial intelligence function. By means of the present invention, insofar as causing small disturbance to an existing building, an original soil body in a building foundation is rapidly replaced with a raft foundation having a greater bearing capacity. The present invention solves the existing technical problem in the prior art of it not being possible to form an integral reinforced raft foundation or box-type foundation below an existing building, significantly improves the bearing capacity of the building foundation, and enhances the stability of the building foundation.
La présente invention concerne en particulier un procédé de construction et un appareil de construction par injection de coulis intelligents pour un radier de bâtiment. Le procédé de construction comprend les étapes consistant à : amener des tuyaux d'injection de coulis à pénétrer dans un corps de sol à renforcer ; injecter un fluide de coupe dans ledit corps de sol au moyen des tuyaux d'injection de coulis, de façon à couper ledit corps de sol pour former une zone de pompage de boue ; pomper du sable et de la boue de gravier générés dans la zone de pompage de boue ; et injecter du coulis dans la zone de pompage de boue au moyen des tuyaux d'injection de coulis tout en effectuant un pompage de boue, de façon à former un corps renforcé après solidification du coulis dans la zone de pompage de boue. L'ensemble du processus est surveillé par des capteurs et des dispositifs de prospection géophysiques, et un dispositif d'alimentation et des trous d'injection de coulis sont commandés pour être construits selon des exigences de conception, de telle sorte que la présente invention a une fonction d'intelligence artificielle. Au moyen de la présente invention, dans la mesure où il s'agit d'une petite perturbation d'un bâtiment existant, un corps de sol d'origine dans une fondation de bâtiment est rapidement remplacé par un radier ayant une plus grande capacité portante. La présente invention résout le problème technique existant dans l'état de la technique selon lequel il n'est pas possible de former un radier renforcé d'un seul tenant ou une fondation de type caisson en dessous d'un bâtiment existant, améliore significativement la capacité portante de la fondation de bâtiment, et améliore la stabilité de la fondation de bâtiment.
本发明具体公开了一种建筑筏板基础的智能注浆施工方法及施工设备,施工方法包括将注浆管贯穿待加固土体;通过注浆管向待加固土体注入切割液,以切割待加固土体形成抽浆区;抽走抽浆区内产生的砂石泥浆;在抽浆的同时,通过注浆管向抽浆区注入灌注浆,以在抽浆区固化后形成加固体。全过程由传感器和物探装置监控,并控制动力装置和注浆孔按设计要求完成施工,具有人工智能功能。本发明实现了在对既有建筑扰动小的情况下,快速将建筑物地基中的原土体置换成具有更大承载力的筏板基础,解决了目前现有技术无法在已有建筑下方形成整体式的配筋筏板基础或箱式基础的技术问题,使建筑物地基的承载能力得到显著提升,提高了建筑物地基的稳固度。
INTELLIGENT GROUTING CONSTRUCTION METHOD AND CONSTRUCTION APPARATUS FOR BUILDING RAFT FOUNDATION
Particularly disclosed in the present invention are an intelligent grouting construction method and construction apparatus for a building raft foundation. The construction method comprises: making grouting pipes penetrate a soil body to be reinforced; injecting a cutting fluid into said soil body by means of the grouting pipes, so as to cut said soil body to form a slurry pumping area; pumping away sand and gravel slurry generated in the slurry pumping area; and injecting grout into the slurry pumping area by means of the grouting pipes while performing slurry pumping, so as to form a reinforced body after the grout solidifies in the slurry pumping area. The whole process is monitored by sensors and geophysical prospecting devices, and a power device and grouting holes are controlled to be constructed according to design requirements, such that the present invention has an artificial intelligence function. By means of the present invention, insofar as causing small disturbance to an existing building, an original soil body in a building foundation is rapidly replaced with a raft foundation having a greater bearing capacity. The present invention solves the existing technical problem in the prior art of it not being possible to form an integral reinforced raft foundation or box-type foundation below an existing building, significantly improves the bearing capacity of the building foundation, and enhances the stability of the building foundation.
La présente invention concerne en particulier un procédé de construction et un appareil de construction par injection de coulis intelligents pour un radier de bâtiment. Le procédé de construction comprend les étapes consistant à : amener des tuyaux d'injection de coulis à pénétrer dans un corps de sol à renforcer ; injecter un fluide de coupe dans ledit corps de sol au moyen des tuyaux d'injection de coulis, de façon à couper ledit corps de sol pour former une zone de pompage de boue ; pomper du sable et de la boue de gravier générés dans la zone de pompage de boue ; et injecter du coulis dans la zone de pompage de boue au moyen des tuyaux d'injection de coulis tout en effectuant un pompage de boue, de façon à former un corps renforcé après solidification du coulis dans la zone de pompage de boue. L'ensemble du processus est surveillé par des capteurs et des dispositifs de prospection géophysiques, et un dispositif d'alimentation et des trous d'injection de coulis sont commandés pour être construits selon des exigences de conception, de telle sorte que la présente invention a une fonction d'intelligence artificielle. Au moyen de la présente invention, dans la mesure où il s'agit d'une petite perturbation d'un bâtiment existant, un corps de sol d'origine dans une fondation de bâtiment est rapidement remplacé par un radier ayant une plus grande capacité portante. La présente invention résout le problème technique existant dans l'état de la technique selon lequel il n'est pas possible de former un radier renforcé d'un seul tenant ou une fondation de type caisson en dessous d'un bâtiment existant, améliore significativement la capacité portante de la fondation de bâtiment, et améliore la stabilité de la fondation de bâtiment.
本发明具体公开了一种建筑筏板基础的智能注浆施工方法及施工设备,施工方法包括将注浆管贯穿待加固土体;通过注浆管向待加固土体注入切割液,以切割待加固土体形成抽浆区;抽走抽浆区内产生的砂石泥浆;在抽浆的同时,通过注浆管向抽浆区注入灌注浆,以在抽浆区固化后形成加固体。全过程由传感器和物探装置监控,并控制动力装置和注浆孔按设计要求完成施工,具有人工智能功能。本发明实现了在对既有建筑扰动小的情况下,快速将建筑物地基中的原土体置换成具有更大承载力的筏板基础,解决了目前现有技术无法在已有建筑下方形成整体式的配筋筏板基础或箱式基础的技术问题,使建筑物地基的承载能力得到显著提升,提高了建筑物地基的稳固度。
INTELLIGENT GROUTING CONSTRUCTION METHOD AND CONSTRUCTION APPARATUS FOR BUILDING RAFT FOUNDATION
PROCÉDÉ DE CONSTRUCTION ET APPAREIL DE CONSTRUCTION PAR INJECTION DE COULIS INTELLIGENTS POUR UN RADIER DE BÂTIMENT
一种建筑筏板基础的智能注浆施工方法及施工设备
ZHANG YIHONG (author) / ZHANG XILI (author)
2024-09-26
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Existing building raft foundation lengthening construction method
European Patent Office | 2022
|Intelligent grouting equipment and pile foundation construction method
European Patent Office | 2020
|Super high-rise building foundation raft construction method
European Patent Office | 2021
|