Toward Autonomous Excavation Planning
Excavation plans are essential in construction projects, dictating the dirt disposal strategy and excavation sequence based on the final geometry and machinery available. While most construction processes rely heavily on coarse sequence planning and local execution planning driven by human expertise and intuition, fully automated planning tools are notably absent from the industry. This article introduces a fully autonomous excavation planning system. Initially, the site is mapped, followed by user selection of the desired excavation geometry. The system then invokes a global planner to determine the sequence of poses for the excavator, ensuring complete site coverage. For each pose, a local excavation planner decides how to move the soil around the machine, and a digging planner subsequently dictates the sequence of digging trajectories to complete a patch. We showcased our system by autonomously excavating the largest pit documented so far, achieving an average digging cycle time of roughly 30 s.
Toward Autonomous Excavation Planning
Excavation plans are essential in construction projects, dictating the dirt disposal strategy and excavation sequence based on the final geometry and machinery available. While most construction processes rely heavily on coarse sequence planning and local execution planning driven by human expertise and intuition, fully automated planning tools are notably absent from the industry. This article introduces a fully autonomous excavation planning system. Initially, the site is mapped, followed by user selection of the desired excavation geometry. The system then invokes a global planner to determine the sequence of poses for the excavator, ensuring complete site coverage. For each pose, a local excavation planner decides how to move the soil around the machine, and a digging planner subsequently dictates the sequence of digging trajectories to complete a patch. We showcased our system by autonomously excavating the largest pit documented so far, achieving an average digging cycle time of roughly 30 s.
Toward Autonomous Excavation Planning
Terenzi, Lorenzo (author) / Hutter, Marco (author)
IEEE Transactions on Field Robotics ; 1 ; 292-317
2024-01-01
18939300 byte
Article (Journal)
Electronic Resource
English
Iterative Autonomous Excavation
Tema Archive | 2013
|Excavation Planning : reference guide
TIBKAT | 1988
|5G Wireless Communication for Autonomous Excavation
TIBKAT | 2022
|Open InfraBIM for remote and autonomous excavation
Elsevier | 2023
|