A platform for research: civil engineering, architecture and urbanism
Total Productive Maintenance Implementation's Barriers and Enablers in Indonesian Manufacturing Companies
Nowadays, Corporate is implementing Total Productive Maintenance (TPM) in order to survive in a very challenging and competitive market. If they want to survive, the have to maintain and even increase their equipment efficiency. However, the TPM utilization is a relatively difficult activity. Some obstacles as well as the supporting factors will determine the speed of the implementation process. Identifying and analyzing those obstacles and supporting factor are very important steps to gain an effective utilization of the TPM. The main discussion of this research is to acquire the significant barriers and enablers of TPM implementation in Indonesian manufacturing companies using Cochran test analysis. In this report, these barriers and enablers have been determined through the literature; data collecting is done by a questionnaire-based survey. There are five significant enablers and seven barriers affecting the achievement rate of TPM.
Total Productive Maintenance Implementation's Barriers and Enablers in Indonesian Manufacturing Companies
Nowadays, Corporate is implementing Total Productive Maintenance (TPM) in order to survive in a very challenging and competitive market. If they want to survive, the have to maintain and even increase their equipment efficiency. However, the TPM utilization is a relatively difficult activity. Some obstacles as well as the supporting factors will determine the speed of the implementation process. Identifying and analyzing those obstacles and supporting factor are very important steps to gain an effective utilization of the TPM. The main discussion of this research is to acquire the significant barriers and enablers of TPM implementation in Indonesian manufacturing companies using Cochran test analysis. In this report, these barriers and enablers have been determined through the literature; data collecting is done by a questionnaire-based survey. There are five significant enablers and seven barriers affecting the achievement rate of TPM.
Total Productive Maintenance Implementation's Barriers and Enablers in Indonesian Manufacturing Companies
Prabowo, Herry Agung (author) / Hilmy, Irfan (author) / Triblas Adesta, Erry Yulian (author)
2020-02-01
430460 byte
Conference paper
Electronic Resource
English
Problems and Barriers Affecting Total Productive Maintenance Implementation
BASE | 2019
|Integrated risk management model implementation's contextual dependence on company size
DOAJ | 2021
|Barriers and Enablers for the Adoption of Sustainable Manufacturing by Manufacturing SMEs
DOAJ | 2022
|E-Commerce in Construction: Barriers and Enablers
British Library Conference Proceedings | 2001
|