A platform for research: civil engineering, architecture and urbanism
The Full-Scale Reinforced Concrete Experiment on the Grantham By-Pass Performance During the First Six Years
The Report describes the structural performance during the first six years of the experimental reinforced concrete pavement laid during 1961 and 1962 on the London-Edinburgh Trunk Road, A.1 at Grantham, Lincolnshire. The road consists of about 10 km (6 miles) of two-lane dual carriageway and comprises 130 experimental slabs varying in length from 9 to 1372 m (30 to 4500 ft). Total daily commercial traffic was 4000 vehicles per day in 1965. (Author)
The Full-Scale Reinforced Concrete Experiment on the Grantham By-Pass Performance During the First Six Years
The Report describes the structural performance during the first six years of the experimental reinforced concrete pavement laid during 1961 and 1962 on the London-Edinburgh Trunk Road, A.1 at Grantham, Lincolnshire. The road consists of about 10 km (6 miles) of two-lane dual carriageway and comprises 130 experimental slabs varying in length from 9 to 1372 m (30 to 4500 ft). Total daily commercial traffic was 4000 vehicles per day in 1965. (Author)
The Full-Scale Reinforced Concrete Experiment on the Grantham By-Pass Performance During the First Six Years
J. R. Nowak (author)
1970
61 pages
Report
No indication
English
Construction of grantham by-pass
Engineering Index Backfile | 1962
|Experimental work on Grantham by-pass
Engineering Index Backfile | 1961
Engineering Index Backfile | 1968
|