A platform for research: civil engineering, architecture and urbanism
GREAT I Study of the Upper Mississippi River. Technical Appendixes. Volume 8. Channel Maintenance. Part I. Narrative
The channel maintenance plan is composed of a detailed dredged material placement plan (described in part I) and a set of supporting recommendations for dredging and channel maintenance. Parts II-V detail the channel maintenance plan by specific sites. (Author)
GREAT I Study of the Upper Mississippi River. Technical Appendixes. Volume 8. Channel Maintenance. Part I. Narrative
The channel maintenance plan is composed of a detailed dredged material placement plan (described in part I) and a set of supporting recommendations for dredging and channel maintenance. Parts II-V detail the channel maintenance plan by specific sites. (Author)
GREAT I Study of the Upper Mississippi River. Technical Appendixes. Volume 8. Channel Maintenance. Part I. Narrative
1980
374 pages
Report
No indication
English
Channel Maintenance Activities on the Upper Mississippi River
British Library Conference Proceedings | 1995
|