A research project was undertaken to evaluate the production and construction variability of Hot Mix Asphalt Concrete (HMAC) containing high quantities of reclaimed asphalt pavement (RAP) material. Four construction projects were selected for this purpose. Two of the projects used 35 percent RAP material (both type-C mixes), while the other two used 40 percent (a type-B mix) and 50 percent (a type-D mix) of the RAP material, respectively. The projects differed in sizes, with total construction tonnage ranging from 10.9 million kg to 27.2 million kg (12,000 to 30,000 tons). In all cases, dedicated stockpiles of RAP material were used. Analysis was performed on the results obtained from the tests. The gradation and asphalt content deviations, air voids, penetration and viscosities, and stabilities, were included in the analysis. Pay adjustment factors were determined for gradation and asphalt content deviation, as well as for air voids (based on TxDOT Specification 3007). In general, these high-percent RAP projects indicated a variability higher than that of a typical HMAC without RAP. The pay adjustment factors for gradation and asphalt content deviation were lower than typical values. The construction gradations were finer than the job-mix formula target gradations, possibly a result of aggregate crushing during the milling operation.
Production Variability Analysis of Hot-Mixed Asphalt Concrete Containing Reclaimed Asphalt Pavement
A research project was undertaken to evaluate the production and construction variability of Hot Mix Asphalt Concrete (HMAC) containing high quantities of reclaimed asphalt pavement (RAP) material. Four construction projects were selected for this purpose. Two of the projects used 35 percent RAP material (both type-C mixes), while the other two used 40 percent (a type-B mix) and 50 percent (a type-D mix) of the RAP material, respectively. The projects differed in sizes, with total construction tonnage ranging from 10.9 million kg to 27.2 million kg (12,000 to 30,000 tons). In all cases, dedicated stockpiles of RAP material were used. Analysis was performed on the results obtained from the tests. The gradation and asphalt content deviations, air voids, penetration and viscosities, and stabilities, were included in the analysis. Pay adjustment factors were determined for gradation and asphalt content deviation, as well as for air voids (based on TxDOT Specification 3007). In general, these high-percent RAP projects indicated a variability higher than that of a typical HMAC without RAP. The pay adjustment factors for gradation and asphalt content deviation were lower than typical values. The construction gradations were finer than the job-mix formula target gradations, possibly a result of aggregate crushing during the milling operation.
Production Variability Analysis of Hot-Mixed Asphalt Concrete Containing Reclaimed Asphalt Pavement
M. Solaimanian (author) / T. W. Kennedy (author)
1995
129 pages
Report
No indication
English
Construction Equipment, Materials, & Supplies , Highway Engineering , Solid Wastes Pollution & Control , Hot mix paving mixtures , Asphalt pavements , Highway construction , Waste utilization , Recycling , Quality control , Field tests , Sampling , Road materials , Aggregates , Test methods , Specifications
British Library Conference Proceedings | 1996
|British Library Online Contents | 1996
|Optimization of Concrete Mixtures Containing Reclaimed Asphalt Pavement
Online Contents | 2015
|Optimization of Concrete Mixtures Containing Reclaimed Asphalt Pavement
British Library Online Contents | 2015
|Evaluation of Asphalt Mixes Containing Reclaimed Asphalt Pavement
Tema Archive | 2012
|