A platform for research: civil engineering, architecture and urbanism
Operational Aspects of Constructing Highway Bridges
;Contents: Roads programme procurement -- some objectives and policy alternatives, and a model of the contractor selection system; The use of cost models for evaluating alternative design and construction strategies; Techniques for observing bridge construction operations; The need for production orientated design in bridges.
Operational Aspects of Constructing Highway Bridges
;Contents: Roads programme procurement -- some objectives and policy alternatives, and a model of the contractor selection system; The use of cost models for evaluating alternative design and construction strategies; Techniques for observing bridge construction operations; The need for production orientated design in bridges.
Operational Aspects of Constructing Highway Bridges
1977
65 pages
Report
No indication
English
A simplified method of constructing fragility curves for highway bridges
Online Contents | 2003
|Engineering Index Backfile | 1904
|Engineering Index Backfile | 1942