A platform for research: civil engineering, architecture and urbanism
Overload Permit Procedures
An analytical study of H15 bridges in Texas has resulted in an improved procedure for issuing overweight truck permits. Single and multiple axle limits, specifically to protest pavements rather than bridges, are assumed. The weight restrictions limit any (and all) axle groups as a function of the gage and tire contact widths. The restrictions were derived to assure that the maximum stress in any bridge member never exceeds the operating level. Only one vehicle is allowed on the bridge at a time but it is assumed to be traveling at a speed such that the full impact allowance is generated.
Overload Permit Procedures
An analytical study of H15 bridges in Texas has resulted in an improved procedure for issuing overweight truck permits. Single and multiple axle limits, specifically to protest pavements rather than bridges, are assumed. The weight restrictions limit any (and all) axle groups as a function of the gage and tire contact widths. The restrictions were derived to assure that the maximum stress in any bridge member never exceeds the operating level. Only one vehicle is allowed on the bridge at a time but it is assumed to be traveling at a speed such that the full impact allowance is generated.
Overload Permit Procedures
J. S. Noel (author) / P. B. Keating (author) / M. J. Mattox (author) / E. P. White (author)
1992
62 pages
Report
No indication
English
Permit Vehicle Routing Using Reliability-Based Evaluation Procedures
British Library Online Contents | 2000
|British Library Online Contents | 2018
|Evaluation of Pavement Performance due to Overload Single-Trip Permit Truck Traffic in Wisconsin
DOAJ | 2018
|