National Dam Safety Program. Vischer Ferry Dam (NY 170), Mohawk River Basin, Saratoga County, New York. Phase I Inspection Report
This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additional studies should be undertaken to further evaluate conditions affecting the dam. (1) Investigate the extent of the deterioration of the spillway sections and the affect of this deterioration on the stability of this structure. Obtain borings and perform stability analysis on those sections of the spillway which have become deteriorated. Follow up with the necessary repairs as indicated by the investigation. (2) Repair south abutment of the north spillway to prevent further deterioration of the shale foundation. (3) The outlet gates on the northern end of the dam are inoperative. The work on the reconstruction of the sluice gates structure which has been awarded for contract by the New York State Department of Transportation should be performed continuously until its completion. It is therefore recommended that within 3 months of the date of notification of the Owners, the above mentioned investigations be undertaken and that required remedial work be completed within 2 years of notification.
National Dam Safety Program. Vischer Ferry Dam (NY 170), Mohawk River Basin, Saratoga County, New York. Phase I Inspection Report
This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additional studies should be undertaken to further evaluate conditions affecting the dam. (1) Investigate the extent of the deterioration of the spillway sections and the affect of this deterioration on the stability of this structure. Obtain borings and perform stability analysis on those sections of the spillway which have become deteriorated. Follow up with the necessary repairs as indicated by the investigation. (2) Repair south abutment of the north spillway to prevent further deterioration of the shale foundation. (3) The outlet gates on the northern end of the dam are inoperative. The work on the reconstruction of the sluice gates structure which has been awarded for contract by the New York State Department of Transportation should be performed continuously until its completion. It is therefore recommended that within 3 months of the date of notification of the Owners, the above mentioned investigations be undertaken and that required remedial work be completed within 2 years of notification.
National Dam Safety Program. Vischer Ferry Dam (NY 170), Mohawk River Basin, Saratoga County, New York. Phase I Inspection Report
J. B. Stetson (author)
1979
193 pages
Report
No indication
English