A platform for research: civil engineering, architecture and urbanism
Underwater Facilities Inspection and Assessment at Magnetic Silencing Facility, Naval Submarine Base, Trident Support Site, Bangor, Washington
The objective of the underwater facility assessment conducted at the naval submarine Base, Bangor, Washington, is to assess the physical condition and repairability of the structural members supporting the Magnetic Silencing Facility, also known as the Deperming Pier, at the Naval Submarine Base, Bangor, Wshington. The Level II inspection procedure carried out was designed to insure the acquisition of sufficiently detailed data related to the internal structural integrity of each pile inspected as the enable determinations to be made of the overall bearing capacity and lateral stability of the pier. The current inspections covered 407 piling (60% of the total of 650 piling in the facility) throughout the structure including the Access Trestle, Header pier and East. and West Piers. All Examined piling, with the exception of three piles in the West Pier, were ound to be in excellent condition.
Underwater Facilities Inspection and Assessment at Magnetic Silencing Facility, Naval Submarine Base, Trident Support Site, Bangor, Washington
The objective of the underwater facility assessment conducted at the naval submarine Base, Bangor, Washington, is to assess the physical condition and repairability of the structural members supporting the Magnetic Silencing Facility, also known as the Deperming Pier, at the Naval Submarine Base, Bangor, Wshington. The Level II inspection procedure carried out was designed to insure the acquisition of sufficiently detailed data related to the internal structural integrity of each pile inspected as the enable determinations to be made of the overall bearing capacity and lateral stability of the pier. The current inspections covered 407 piling (60% of the total of 650 piling in the facility) throughout the structure including the Access Trestle, Header pier and East. and West Piers. All Examined piling, with the exception of three piles in the West Pier, were ound to be in excellent condition.
Underwater Facilities Inspection and Assessment at Magnetic Silencing Facility, Naval Submarine Base, Trident Support Site, Bangor, Washington
1980
94 pages
Report
No indication
English
British Library Conference Proceedings | 1995
|