A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Houghton Pond Dam (MA 00444), Charles River Basin, Holliston, Massachusetts. Phase 1 Inspection Report
This dam consists of an earth embankment approximately 90 ft. in length, a 29.2 ft. long stone masonry auxiliary spillway and a 6.9 ft. long concrete spillway (outlet) structure controlled by stoplogs. The maximum height of the dam is 9.5 ft. The dam is in fair condition, based on visual examination. It has a classification of small and a potential hazard of significant. A professional engineer should be hired by the town to investigate certain deficiencies of the dam.
National Program for Inspection of Non-Federal Dams. Houghton Pond Dam (MA 00444), Charles River Basin, Holliston, Massachusetts. Phase 1 Inspection Report
This dam consists of an earth embankment approximately 90 ft. in length, a 29.2 ft. long stone masonry auxiliary spillway and a 6.9 ft. long concrete spillway (outlet) structure controlled by stoplogs. The maximum height of the dam is 9.5 ft. The dam is in fair condition, based on visual examination. It has a classification of small and a potential hazard of significant. A professional engineer should be hired by the town to investigate certain deficiencies of the dam.
National Program for Inspection of Non-Federal Dams. Houghton Pond Dam (MA 00444), Charles River Basin, Holliston, Massachusetts. Phase 1 Inspection Report
1979
77 pages
Report
No indication
English