A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Lyman Mill Pond (MA 00500), Connecticut River Basin, Southampton, Massachusetts. Phase 1 Inspection Report
The dam is a buttressed ten foot high, 90 feet wide spillway, with concrete training walls. The visual inspection of the dam indicated it to be in generally fair condition, due to the finding of a seepage boil. The dam has a size classification of small and a hazard classification of low. It is recommended that the owner engage a qualified engineer to investigate the foundation of the right abutment wall and if necessary, design a seepage protection system where a seepage boil was found.
National Program for Inspection of Non-Federal Dams. Lyman Mill Pond (MA 00500), Connecticut River Basin, Southampton, Massachusetts. Phase 1 Inspection Report
The dam is a buttressed ten foot high, 90 feet wide spillway, with concrete training walls. The visual inspection of the dam indicated it to be in generally fair condition, due to the finding of a seepage boil. The dam has a size classification of small and a hazard classification of low. It is recommended that the owner engage a qualified engineer to investigate the foundation of the right abutment wall and if necessary, design a seepage protection system where a seepage boil was found.
National Program for Inspection of Non-Federal Dams. Lyman Mill Pond (MA 00500), Connecticut River Basin, Southampton, Massachusetts. Phase 1 Inspection Report
1979
89 pages
Report
No indication
English