An Application for Major License Filed by Green Bay and Mississippi Canal Company for Constructed Combined Locks Project No. 2715-Wisconsin
The project consists of a small reservoir; a dam with an overall length of about 1005 feet long consisting of a non overflow section on the left abutment, a gated spillway section, an ungated spillway section, a grinder building section on the right abutment section with trash rack and forebay, a powerhouse containing two 300 kw units, two 350 kw units, two 595 kw units and one 400 kw unit, four mechanical units located in the grinder building each rated 550 horsepower at 20 foot head, a substation, and appurtenant facilities. There is no available land for recreational use adjacent to or within the project area.
An Application for Major License Filed by Green Bay and Mississippi Canal Company for Constructed Combined Locks Project No. 2715-Wisconsin
The project consists of a small reservoir; a dam with an overall length of about 1005 feet long consisting of a non overflow section on the left abutment, a gated spillway section, an ungated spillway section, a grinder building section on the right abutment section with trash rack and forebay, a powerhouse containing two 300 kw units, two 350 kw units, two 595 kw units and one 400 kw unit, four mechanical units located in the grinder building each rated 550 horsepower at 20 foot head, a substation, and appurtenant facilities. There is no available land for recreational use adjacent to or within the project area.
An Application for Major License Filed by Green Bay and Mississippi Canal Company for Constructed Combined Locks Project No. 2715-Wisconsin
1972
78 pages
Report
No indication
English
Canal and locks at chain of rocks, Mississippi River
Engineering Index Backfile | 1955
|