A platform for research: civil engineering, architecture and urbanism
Operation Breakthrough: Prototype Site Planner, Kalamazoo, Michigan
The organization of the report is based on the planners four major task areas: site analysis and conceptual planning, housing system analysis and preliminary planning, contract document development, and inspection and coordination during construction. The report includes plans, graphics, photos, and narrative which illustrate the quality of the work accomplished and the overall site design and landscape elements. (Author)
Operation Breakthrough: Prototype Site Planner, Kalamazoo, Michigan
The organization of the report is based on the planners four major task areas: site analysis and conceptual planning, housing system analysis and preliminary planning, contract document development, and inspection and coordination during construction. The report includes plans, graphics, photos, and narrative which illustrate the quality of the work accomplished and the overall site design and landscape elements. (Author)
Operation Breakthrough: Prototype Site Planner, Kalamazoo, Michigan
1972
65 pages
Report
No indication
English
Availability of water in Kalamazoo County, southwestern Michigan
TIBKAT | 1972
|Availability of water in Kalamazoo County, southwestern Michigan
UB Braunschweig | 1972
|