A platform for research: civil engineering, architecture and urbanism
The examination of documents and visual inspection of the Watervliet Lower Dam and appurtenant structures did not reveal conditions which constitute a hazard to human life or property. The discharge capacity of the spillway is inadequate for all storms in excess of 77% of the PMF (Probable Maximum Flood). During the 1/2 PMF event, the maximum water surface will be 4.4 feet below the top of dam. However, the dam will be overtopped by 2.0 feet during the full PMF; therefore the spillway is assessed as 'Inadequate'. The following problems were observed which require remedial action within one year of notification to the owner: Clean the deteriorated concrete and repair those areas where significant concrete is needed and where reinforcing bars are exposed; Repair the construction joints and cracking of the spillway; Remove the debris and sediment from the vicinity of the intakes and the downstream channel; Consider removal of penstock; Remove the tree and brush growth from the abutments upstream area and downstream channel. Provide a program of periodic cutting at these locations; Provide a program of periodic inspection and maintenance of the dam and appurtenances including periodic removal of sediment and debris; Develop an emergency action plan for notification of downstream residents and the proper governmental authorities.
The examination of documents and visual inspection of the Watervliet Lower Dam and appurtenant structures did not reveal conditions which constitute a hazard to human life or property. The discharge capacity of the spillway is inadequate for all storms in excess of 77% of the PMF (Probable Maximum Flood). During the 1/2 PMF event, the maximum water surface will be 4.4 feet below the top of dam. However, the dam will be overtopped by 2.0 feet during the full PMF; therefore the spillway is assessed as 'Inadequate'. The following problems were observed which require remedial action within one year of notification to the owner: Clean the deteriorated concrete and repair those areas where significant concrete is needed and where reinforcing bars are exposed; Repair the construction joints and cracking of the spillway; Remove the debris and sediment from the vicinity of the intakes and the downstream channel; Consider removal of penstock; Remove the tree and brush growth from the abutments upstream area and downstream channel. Provide a program of periodic cutting at these locations; Provide a program of periodic inspection and maintenance of the dam and appurtenances including periodic removal of sediment and debris; Develop an emergency action plan for notification of downstream residents and the proper governmental authorities.
National Dam Safety Program. Watervliet Lower Dam (Inventory Number NY 1357), Lower Hudson River Basin, Albany County, New York. Phase I Inspection Report
G. Koch (author)
1981
70 pages
Report
No indication
English