A platform for research: civil engineering, architecture and urbanism
This report describes the construction and performance of 4 concrete and 16 asphalt overlay test sections after nine years of traffic. The test sections were placed on I-85 which carries a substantial number of heavy trucks to determine what treatments and overlay type and thickness would give acceptable performance. The concrete overlay sections were placed in 1975 and consisted of 3 inch, 4 1/2 inch, and 6 inch CRC and 6 inch jointed PCC with 15 ft. and 30 ft. joint spacing. The asphalt sections were placed in 1976 with the variables being overlay thickness of 2 inches, 4 inches, and 6 inches and the placement of two geotextiles and strips of a waterproofing membrane for each overlay thickness. An Arkansas base test section was also included in the experiment.
This report describes the construction and performance of 4 concrete and 16 asphalt overlay test sections after nine years of traffic. The test sections were placed on I-85 which carries a substantial number of heavy trucks to determine what treatments and overlay type and thickness would give acceptable performance. The concrete overlay sections were placed in 1975 and consisted of 3 inch, 4 1/2 inch, and 6 inch CRC and 6 inch jointed PCC with 15 ft. and 30 ft. joint spacing. The asphalt sections were placed in 1976 with the variables being overlay thickness of 2 inches, 4 inches, and 6 inches and the placement of two geotextiles and strips of a waterproofing membrane for each overlay thickness. An Arkansas base test section was also included in the experiment.
Overlays for Plain Jointed Concrete Pavements
1984
72 pages
Report
No indication
English
Foundation Voiding in Jointed Plain Concrete Pavements
ASCE | 2017
|Foundation Voiding in Jointed Plain Concrete Pavements
Online Contents | 2017
|Crack Resistance of Jointed Plain Concrete Pavements
British Library Online Contents | 2002
|Crack Resistance of Jointed Plain Concrete Pavements
British Library Conference Proceedings | 2002
|