Initial Inspection Report for Fatigue Evaluation Bridge 9340 I-35W over Mississippi River
We have completed a limited field inspection of the main truss section of Bridge 9340 (TH 35W over the Mississippi River). The inspection was performed during MnDOT's normal inspection cyucle on June 9, 2003 to June 13, 2003. The purpose of the inspection was to observe the overall condition of the truss members, floor beams, truss bearings, truss connections, miscellaneous connections and bracing members.
Initial Inspection Report for Fatigue Evaluation Bridge 9340 I-35W over Mississippi River
We have completed a limited field inspection of the main truss section of Bridge 9340 (TH 35W over the Mississippi River). The inspection was performed during MnDOT's normal inspection cyucle on June 9, 2003 to June 13, 2003. The purpose of the inspection was to observe the overall condition of the truss members, floor beams, truss bearings, truss connections, miscellaneous connections and bracing members.
Initial Inspection Report for Fatigue Evaluation Bridge 9340 I-35W over Mississippi River
2003
198 pages
Report
No indication
English
Highway Engineering , Transportation & Traffic Planning , Transportation , Highway bridges , Structural analysis , Bridge inspection , Fatigue(Materials) , Minnesota , Mississippi , Bridge decks , Roller bearings , Welded joints , Diaphragms , Fatigue cracking , Truss plates , Joints(Junctions) , Trusses , Loads(Forces) , I-35 bridge , Minneapolis(Minnesota) , Interstate highway 35 , Structural redundancy
Fatigue Evaluation of the Deck Truss of Bridge 9340
NTIS | 2001
|Engineering Index Backfile | 1960
Cape Girardeau Bridge over the Mississippi River