A platform for research: civil engineering, architecture and urbanism
Cost Estimators for Construction of Forest Roads in Central Appalachians
Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment is rented hourly. The estimates presented are for well-drained, stone-surfaced, permanent, minimum- to high-standard roads.
Cost Estimators for Construction of Forest Roads in Central Appalachians
Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment is rented hourly. The estimates presented are for well-drained, stone-surfaced, permanent, minimum- to high-standard roads.
Cost Estimators for Construction of Forest Roads in Central Appalachians
D. A. Layton (author) / C. B. LeDoux (author) / C. C. Hassler (author)
1992
8 pages
Report
No indication
English
Low Cost Roads : design, construction and maintenance
TIBKAT | 1971
|Construction of low-cost roads with tar
Engineering Index Backfile | 1936
|Recent developments in construction of low cost roads
Engineering Index Backfile | 1936
|Construction and maintenance of low-cost bituminous roads
Engineering Index Backfile | 1935
|A Cost Effectiveness Analysis of Forestry Versus Pasture Reclamation in the Southern Appalachians
British Library Conference Proceedings | 2008
|