A platform for research: civil engineering, architecture and urbanism
Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 5. Priority Ranking Method. Executive Summary (Revised)
The report is the fifth of a six-volume final report and it presents the findings of the part of the research work dealing with the development of a priority ranking method for bridge project selection. The volume also includes an analysis to determine the effectiveness of bridge replacement and rehabilitation projects with respect to bridge structural condition ratings and remaining service lives. The titles of all six volumes are listed below: Vol. 1. Elements of Indiana Bridge Management System (IBMS); Vol. 2. A System for Bridge Structural Condition Assessment; Vol. 3. Bridge Traffic Safety Evaluation; Vol. 4. Cost Analysis; Vol. 5. Priority Ranking Method; and Vol. 6. Bridge Performance and Optimization.
Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 5. Priority Ranking Method. Executive Summary (Revised)
The report is the fifth of a six-volume final report and it presents the findings of the part of the research work dealing with the development of a priority ranking method for bridge project selection. The volume also includes an analysis to determine the effectiveness of bridge replacement and rehabilitation projects with respect to bridge structural condition ratings and remaining service lives. The titles of all six volumes are listed below: Vol. 1. Elements of Indiana Bridge Management System (IBMS); Vol. 2. A System for Bridge Structural Condition Assessment; Vol. 3. Bridge Traffic Safety Evaluation; Vol. 4. Cost Analysis; Vol. 5. Priority Ranking Method; and Vol. 6. Bridge Performance and Optimization.
Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 5. Priority Ranking Method. Executive Summary (Revised)
M. Saito (author) / K. C. Sinha (author)
1990
10 pages
Report
No indication
English
Highway Engineering , Transportation & Traffic Planning , Transportation , Information Systems , Management Information Systems , Highway bridges , Bridge maintenance , Management systems , Ranking , Service life , Cost effectiveness , Highway maintenance , Cost analysis , Indiana , Maintenance management , Bridge decks