A platform for research: civil engineering, architecture and urbanism
Estimating Handbook for Building Maintenance: Based on 'Schedule of Rates for Building Works 1985'
The Handbook has been prepared primarily to assist in the preparation of estimates for maintenance work carried out under Measured Term Contracts. The rates used in the Handbook are the NET rates from the 'Schedule of Rates for Building Works 1985' and thus include the cost of resources as at the middle of 1985. Maintenance tasks include excavation and concrete, brickwork and blockwork, asphalt, roofing, carpentry, painting and drainage.
Estimating Handbook for Building Maintenance: Based on 'Schedule of Rates for Building Works 1985'
The Handbook has been prepared primarily to assist in the preparation of estimates for maintenance work carried out under Measured Term Contracts. The rates used in the Handbook are the NET rates from the 'Schedule of Rates for Building Works 1985' and thus include the cost of resources as at the middle of 1985. Maintenance tasks include excavation and concrete, brickwork and blockwork, asphalt, roofing, carpentry, painting and drainage.
Estimating Handbook for Building Maintenance: Based on 'Schedule of Rates for Building Works 1985'
1988
113 pages
Report
No indication
English
Building maintenance planning and estimating system
Taylor & Francis Verlag | 1983
|Estimating for building and civil engineering works
TIBKAT | 1996
|Estimating for building and civil engineering works
TIBKAT | 1985
|