A platform for research: civil engineering, architecture and urbanism
Purity data on Redox start-up material through the 231 and 234-5 Buildings
Redox effluent for production was first processed in the 231 Building on February 4, 1952. Samples of process streams were taken after each purification step to evaluate the adequacy of purification processes in,the 231 and 234-5 Buildings and to provide close control of this material. Data regarding pile residence histories, radiation surveys of 'Sample Cans', reduction yields, C/Q values, and product purity after purification steps were accumulated and are presented in this report to establish preliminary data which may be used to evaluate future process changes.
Purity data on Redox start-up material through the 231 and 234-5 Buildings
Redox effluent for production was first processed in the 231 Building on February 4, 1952. Samples of process streams were taken after each purification step to evaluate the adequacy of purification processes in,the 231 and 234-5 Buildings and to provide close control of this material. Data regarding pile residence histories, radiation surveys of 'Sample Cans', reduction yields, C/Q values, and product purity after purification steps were accumulated and are presented in this report to establish preliminary data which may be used to evaluate future process changes.
Purity data on Redox start-up material through the 231 and 234-5 Buildings
P. E. Collins (author)
1952
10 pages
Report
No indication
English
Optimum start controls in modern low-energy buildings
TIBKAT | 1983
|Heat loss through buildings and building material
Engineering Index Backfile | 1916
|