A platform for research: civil engineering, architecture and urbanism
Review of stuck slugs
Records show that difficulty has been encountered with the discharge of two tubes in B Pile, twelve in the D Pile, and fifteen in the F Pile during the period from initial start-up until March 15, 1948. In sixteen cases the tubes have been replaced, six of the tubes which were in the fringe have been made air tubes, four did not warrant replacement, and three are to be replaced in the future. General statistics for these twenty-nine tubes are presented with additional details in this report.
Review of stuck slugs
Records show that difficulty has been encountered with the discharge of two tubes in B Pile, twelve in the D Pile, and fifteen in the F Pile during the period from initial start-up until March 15, 1948. In sixteen cases the tubes have been replaced, six of the tubes which were in the fringe have been made air tubes, four did not warrant replacement, and three are to be replaced in the future. General statistics for these twenty-nine tubes are presented with additional details in this report.
Review of stuck slugs
W. K. Alexander (author) / W. K. Woods (author)
1948
9 pages
Report
No indication
English
Use grading of classified slugs
NTIS | 1994
|Slugs and Bodysnatchers: Adventures in Dynamic Ridesharing
British Library Online Contents | 2001
|Online Contents | 2013
Stück für Stück - T.B.A. Design Societät
Online Contents | 1997
Slugs and Snails and Puppy Dogs' Tails
British Library Conference Proceedings | 1998
|