A platform for research: civil engineering, architecture and urbanism
Buffer Mass Test - Rock Drilling and Civil Engineering
The buffer mass test (BMT) is being run in the former 'ventilation drift' in which a number of rock investigations were previously conducted. A number of vertical pilot holes were drilled from the tunnel floor to get information of the water inflow in possible heater hole position. The final decision of the location of the heater holes was then made, the main principle being that much water should be available in each hole with the possible exception of one of the holes. Thereafter, the diameter 0.76 m heater holes were drilled to a depth of 3-3.3 m. Additional holes were then drilled for rock anchoring of the lids of the four outer heater holes, for the rock mechanical investigation, as well as for a number of water pressure gauges. The inner, about 12 m long part of the tunnel, was separated from the outer by bulwark. The purpose of this construction was to confine a backfill, the requirements of the bulwark being to withstand the swelling pressure as well as the water pressure. Outside the bulwark an approximately 1.5-1.7 m thick concrete slab was cast on the tunnel floor, extending about 24.7 m from the bulwark. Boxing-outs with the same height as the slab and with the horizontal dimensions 1.8 x 1.8 m, were made and rock-anchored concrete lids were cast on top of them after backfilling. The slab which thus represents 'rock', also forms a basal support of the bulwark. The l. (Atomindex citation 14:747174)
Buffer Mass Test - Rock Drilling and Civil Engineering
The buffer mass test (BMT) is being run in the former 'ventilation drift' in which a number of rock investigations were previously conducted. A number of vertical pilot holes were drilled from the tunnel floor to get information of the water inflow in possible heater hole position. The final decision of the location of the heater holes was then made, the main principle being that much water should be available in each hole with the possible exception of one of the holes. Thereafter, the diameter 0.76 m heater holes were drilled to a depth of 3-3.3 m. Additional holes were then drilled for rock anchoring of the lids of the four outer heater holes, for the rock mechanical investigation, as well as for a number of water pressure gauges. The inner, about 12 m long part of the tunnel, was separated from the outer by bulwark. The purpose of this construction was to confine a backfill, the requirements of the bulwark being to withstand the swelling pressure as well as the water pressure. Outside the bulwark an approximately 1.5-1.7 m thick concrete slab was cast on the tunnel floor, extending about 24.7 m from the bulwark. Boxing-outs with the same height as the slab and with the horizontal dimensions 1.8 x 1.8 m, were made and rock-anchored concrete lids were cast on top of them after backfilling. The slab which thus represents 'rock', also forms a basal support of the bulwark. The l. (Atomindex citation 14:747174)
Buffer Mass Test - Rock Drilling and Civil Engineering
R. Pusch (author) / J. Nilsson (author)
1982
79 pages
Report
No indication
English
Rock mass classification : a practical approach in civil engineering
UB Braunschweig | 1999
|Rock mass classification : a practical approach in civil engineering
UB Braunschweig | 1999
|Rock engineering and civil construction
British Library Conference Proceedings | 1994
|