A platform for research: civil engineering, architecture and urbanism
Final Environmental Assessment: For the Eglin Dormitory Master Plan
The Proposed Action is for the Air Force proponent (796 Civil Engineering Squadron/Civil Engineering Planning Office [796 CES/CEOP]) to implement a Dormitory Master Plan (DMP) that allows for expansion of dormitory facilities and infrastructure through the demolition and construction of new dormitory facilities at Eglin Air Force Base (AFB) (Figure 1-1). The DMP would outline the requirements for the demolition of older dormitory structures and the construction of new buildings and infrastructure at existing sites located on Eglin AFB Main Base (Figure 1-2). Under the Proposed Action, the DMP would involve the demolition of three existing dormitories and construction of six new dormitory buildings which would provide billeting for approximately 288 occupants. The DMP would also involve improvement of associated roads and construction of parking areas. This would be the first of three phases planned over the next 16 years. Chapter 2 provides more detailed information for the proposed project activities.
Final Environmental Assessment: For the Eglin Dormitory Master Plan
The Proposed Action is for the Air Force proponent (796 Civil Engineering Squadron/Civil Engineering Planning Office [796 CES/CEOP]) to implement a Dormitory Master Plan (DMP) that allows for expansion of dormitory facilities and infrastructure through the demolition and construction of new dormitory facilities at Eglin Air Force Base (AFB) (Figure 1-1). The DMP would outline the requirements for the demolition of older dormitory structures and the construction of new buildings and infrastructure at existing sites located on Eglin AFB Main Base (Figure 1-2). Under the Proposed Action, the DMP would involve the demolition of three existing dormitories and construction of six new dormitory buildings which would provide billeting for approximately 288 occupants. The DMP would also involve improvement of associated roads and construction of parking areas. This would be the first of three phases planned over the next 16 years. Chapter 2 provides more detailed information for the proposed project activities.
Final Environmental Assessment: For the Eglin Dormitory Master Plan
S. Baker-Littman (author) / B. Penrose (author) / H. McLaurine (author) / A. Sands (author) / D. Robau (author)
2006
103 pages
Report
No indication
English
Environmental & Occupational Factors , Structural Analyses , Logistics, Military Facilities, & Supplies , Environmental Health & Safety , Air force facilities , Construction , Environmental assessment , Housing projects , Air quality , Erosion , Geology , Hazardous materials , Hazardous wastes , Infrastructure , Noise , Soils , Water quality , Alternatives , Dormitory master plans , Fonsi(finding of no significant impact) , Infrastructure. water quality
Online Contents | 2009
British Library Online Contents | 1997