A platform for research: civil engineering, architecture and urbanism
Development of a High-Temperature Diagnostics-While Drilling Tool
This report documents work performed in the second phase of the Diagnostics- While-Drilling (DWD) project in which a high-temperature (HT) version of the phase 1 low-temperature (LT) proof-of-concept (POC) DWD tool was built and tested. Descriptions of the design, fabrication and field testing of the HT tool are provided.
Development of a High-Temperature Diagnostics-While Drilling Tool
This report documents work performed in the second phase of the Diagnostics- While-Drilling (DWD) project in which a high-temperature (HT) version of the phase 1 low-temperature (LT) proof-of-concept (POC) DWD tool was built and tested. Descriptions of the design, fabrication and field testing of the HT tool are provided.
Development of a High-Temperature Diagnostics-While Drilling Tool
D. Blankenship (author) / D. Chavira (author) / J. Henfling (author) / C. Hetmaiak (author) / D. Huey (author)
2009
62 pages
Report
No indication
English
Tool for logging while drilling
Online Contents | 1994
Tool Failure Criteria while Drilling Titanium Alloys
British Library Online Contents | 2010
|DRILLING OPERATIONS - Reaming-while-drilling cuts tripping
Online Contents | 1996
Logging-while-drilling technology continues to reduce drilling risk
Online Contents | 2012
Signal Processing in Logging While Drilling
Springer Verlag | 2019
|