A platform for research: civil engineering, architecture and urbanism
First tunnel section of the Superconducting Super Collider project
The Superconducting Super Collider (SSC) project will be constructed for the United States Department of Energy at a competitively-selected site in Ellis County, Texas, about 30 mile (50 km) south of the central business district of Dallas. The injector system and main collider ring will be housed in 70 mile (110 km) of tunnel, and the project will include additional shafts and underground enclosures with clear spans up to 30 ft (10 m) at depths of more than 250 ft (75 m). The first tunnel segment to be designed and constructed will include approximately 5.9 mile (9.4 km) of 12 ft (3.7 m) finished internal diameter tunnel, four shafts up to 55 ft (16.8 m) diameter, and various connecting tunnels and adits. Construction will be in weak rock lithologies, including mudstones, marls, and chalks with compressive strengths typically between 300 and 2500 psi (2.0 and 17.2 MPa). Design is underway, with an expected bid date before the end of 1990, and with start of construction following in the spring of 1991. 7 refs., 8 figs., 1 tab.
First tunnel section of the Superconducting Super Collider project
The Superconducting Super Collider (SSC) project will be constructed for the United States Department of Energy at a competitively-selected site in Ellis County, Texas, about 30 mile (50 km) south of the central business district of Dallas. The injector system and main collider ring will be housed in 70 mile (110 km) of tunnel, and the project will include additional shafts and underground enclosures with clear spans up to 30 ft (10 m) at depths of more than 250 ft (75 m). The first tunnel segment to be designed and constructed will include approximately 5.9 mile (9.4 km) of 12 ft (3.7 m) finished internal diameter tunnel, four shafts up to 55 ft (16.8 m) diameter, and various connecting tunnels and adits. Construction will be in weak rock lithologies, including mudstones, marls, and chalks with compressive strengths typically between 300 and 2500 psi (2.0 and 17.2 MPa). Design is underway, with an expected bid date before the end of 1990, and with start of construction following in the spring of 1991. 7 refs., 8 figs., 1 tab.
First tunnel section of the Superconducting Super Collider project
T. K. Lundin (author) / C. Laughton (author) / P. P. Nelson (author)
1990
28 pages
Report
No indication
English
Superconducting Super Collider Tunnel Shafts
British Library Conference Proceedings | 1993
|Construction Behavior of the First Underground Opening of the Superconducting Super Collider Project
British Library Conference Proceedings | 1993
|Construction of the N20 to N25 Tunnel (basic) Segment of the Superconducting Super Collider Project
British Library Conference Proceedings | 1995
|Superconducting Super Collider Shaft Excavation
British Library Conference Proceedings | 1993
|Construction of the 1122/1130 Tunnels on the Superconducting Super Collider Project
British Library Conference Proceedings | 1995
|