A platform for research: civil engineering, architecture and urbanism
Heating Facilities: Klamath Lutheran Church, Klamath Falls, Oregon
The Klamath Lutheran Church is a masonry structure with cathedral ceiling containing approximately 5800 sq ft of floor area. This building is currently heated by two duct furnaces and a unit heater all of which are gas fired. An Educational Wing of approximately 6300 sq ft was added in 1958. This building, containing 2 assembly rooms and a number of classrooms is of uninsulated frame construction, with extensive glass area. A gas-fired boiler supplying finned tube radiators currently heats this wing. Four specific options for displacing all or part of the heating duty with geothermal were examined. These options are: case 1 - drilling a production and injection well on the property and using the resultant hot water (180 exp 0 F) to heat the entire facility; case 3 - using effluent from the Klamath Union High School to heat the entire facility; no well drilling required; case 2 - using effluent from the Klamath Union High School to heat only the church building; the present gas boiler would heat the Educational Wing; and case 4 - drilling a production and injection well on the property and using the resulting water (70 exp 0 F) to supply a water-to-water heat pump. Of the four cases examined, case 3 (heating of both the church building and educational wing with effluent from the Klamath Union High School) seems to offer the greatest potential and earliest simple payback period. (ERA citation 06:009096)
Heating Facilities: Klamath Lutheran Church, Klamath Falls, Oregon
The Klamath Lutheran Church is a masonry structure with cathedral ceiling containing approximately 5800 sq ft of floor area. This building is currently heated by two duct furnaces and a unit heater all of which are gas fired. An Educational Wing of approximately 6300 sq ft was added in 1958. This building, containing 2 assembly rooms and a number of classrooms is of uninsulated frame construction, with extensive glass area. A gas-fired boiler supplying finned tube radiators currently heats this wing. Four specific options for displacing all or part of the heating duty with geothermal were examined. These options are: case 1 - drilling a production and injection well on the property and using the resultant hot water (180 exp 0 F) to heat the entire facility; case 3 - using effluent from the Klamath Union High School to heat the entire facility; no well drilling required; case 2 - using effluent from the Klamath Union High School to heat only the church building; the present gas boiler would heat the Educational Wing; and case 4 - drilling a production and injection well on the property and using the resulting water (70 exp 0 F) to supply a water-to-water heat pump. Of the four cases examined, case 3 (heating of both the church building and educational wing with effluent from the Klamath Union High School) seems to offer the greatest potential and earliest simple payback period. (ERA citation 06:009096)
Heating Facilities: Klamath Lutheran Church, Klamath Falls, Oregon
1980
19 pages
Report
No indication
English
British Library Conference Proceedings | 1999
|Gerber dam, Klamath project, Oregon -- Details of design and construction
Engineering Index Backfile | 1926
|