Engineering Considerations for Capping Subaqueous Dredged Material Deposits -- Background and Preliminary Planing
The following two technical notes present information applicable to planning and constructing dredged material capping projects: EEDP-O1-3 Background and Preliminary Planning EEDP-O1-4 Design Concepts and Placement Techniques This first note identifies and reviews field experiences with subaqueous capping of dredged material and discusses aspects of site selection.
Engineering Considerations for Capping Subaqueous Dredged Material Deposits -- Background and Preliminary Planing
The following two technical notes present information applicable to planning and constructing dredged material capping projects: EEDP-O1-3 Background and Preliminary Planning EEDP-O1-4 Design Concepts and Placement Techniques This first note identifies and reviews field experiences with subaqueous capping of dredged material and discusses aspects of site selection.
Engineering Considerations for Capping Subaqueous Dredged Material Deposits -- Background and Preliminary Planing
C. L. Truitt (author)
1987
14 pages
Report
No indication
English
Guidance for Subaqueous Dredged Material Capping
NTIS | 1998
|Boston Harbor Dredged Material Capping Simulation
NTIS | 2001
|Placing and Capping Fine-Grained Dredged Material
ASCE | 2003
|A floating caisson for capping subaqueous piles
Engineering Index Backfile | 1914
|