A platform for research: civil engineering, architecture and urbanism
NMP F-032-1(13); F-032-1(15); F-032-1(16); F-032-1(17) Shiprock-Farmington, New Mexico
The proposal covers construction of a four-lane divided highway from Shiprock, New Mexico, easterly to the west city limits of Farmington, New Mexico. Alignment generally follows existing alignment of U.S. 550 and will replace this facility. Some deviations from existing U.S. 550 are discussed. Construction will originate in the Navajo Indian Tribal Reservation and will be contained in this reservation for approximately 8.3 miles. Construction is all contained in San Juan County, and the total length is approximately 26.4 miles. Proposed work is divided into five construction projects.
NMP F-032-1(13); F-032-1(15); F-032-1(16); F-032-1(17) Shiprock-Farmington, New Mexico
The proposal covers construction of a four-lane divided highway from Shiprock, New Mexico, easterly to the west city limits of Farmington, New Mexico. Alignment generally follows existing alignment of U.S. 550 and will replace this facility. Some deviations from existing U.S. 550 are discussed. Construction will originate in the Navajo Indian Tribal Reservation and will be contained in this reservation for approximately 8.3 miles. Construction is all contained in San Juan County, and the total length is approximately 26.4 miles. Proposed work is divided into five construction projects.
NMP F-032-1(13); F-032-1(15); F-032-1(16); F-032-1(17) Shiprock-Farmington, New Mexico
1972
37 pages
Report
No indication
English
Shiprock comprehensive care facility Shiprock, New Mexico - ADP fluor Daniel, Architects
Online Contents | 1995
Farmington Canal Greenway Master Plan
British Library Online Contents | 1998
Identification of Geobacter Populations in the Uranium Mill Tailings Shiprock
British Library Online Contents | 2006
|A History of the Farmington Plan
British Library Online Contents | 2003
|