A platform for research: civil engineering, architecture and urbanism
A memorandum prepared by the Technical Department discussing the technical considerations involved in raising Pile power above the present level of 280 M.W. was discussed. A meeting attended by W. O. Simon, B. H. Mackey, L. Squires, H. Worthington, C. N. Gross, W. E. Jordan and M. H. Smith. The details of this memorandum were reviewed and the plan proposed for operation of the piles subsequent to August 1, 1945 is discussed in this report.
A memorandum prepared by the Technical Department discussing the technical considerations involved in raising Pile power above the present level of 280 M.W. was discussed. A meeting attended by W. O. Simon, B. H. Mackey, L. Squires, H. Worthington, C. N. Gross, W. E. Jordan and M. H. Smith. The details of this memorandum were reviewed and the plan proposed for operation of the piles subsequent to August 1, 1945 is discussed in this report.
Pile power level
M. H. Smith (author)
1945
2 pages
Report
No indication
English
Recommended C Pile power level limits
NTIS | 1952
|Limits of pile operating level
NTIS | 1950
|NTIS | 1953
|PCC energy pile with variable power and pile mold for energy pile
European Patent Office | 2020
|