A platform for research: civil engineering, architecture and urbanism
Application of the Knowledge Derived from the KREV on Actual Building Project. KREV-A
A study already established for the BMFT in 1976 (03E-5126) with the title KREV (Concept for an efficient and economic use and supply of energy demonstrated) by the example of the new buildings of the Federal Diet and Federal Council supplied a variety of new data-substantiated knowledge of the close connection between the building design and technical equipment of the building, the maximum possible luxury and consumption of energy in major buildings. Among the results of special significance derived from the KREV study is the finding that the builder, architect and engineer must cooperate in the earliest stages of the project preparation and planning in order to be able to efficiently use all possibilities of energy saving. In the follow-up study (KREV-A) the application of knowledge derived from KREV was examined in four real construction projects. Here: Gustav-Heinemann-Haus, Bonn-Tannenbusch - complex of buildings in operation. (ERA citation 09:026180)
Application of the Knowledge Derived from the KREV on Actual Building Project. KREV-A
A study already established for the BMFT in 1976 (03E-5126) with the title KREV (Concept for an efficient and economic use and supply of energy demonstrated) by the example of the new buildings of the Federal Diet and Federal Council supplied a variety of new data-substantiated knowledge of the close connection between the building design and technical equipment of the building, the maximum possible luxury and consumption of energy in major buildings. Among the results of special significance derived from the KREV study is the finding that the builder, architect and engineer must cooperate in the earliest stages of the project preparation and planning in order to be able to efficiently use all possibilities of energy saving. In the follow-up study (KREV-A) the application of knowledge derived from KREV was examined in four real construction projects. Here: Gustav-Heinemann-Haus, Bonn-Tannenbusch - complex of buildings in operation. (ERA citation 09:026180)
Application of the Knowledge Derived from the KREV on Actual Building Project. KREV-A
K. Binder (author) / M. Philipps (author) / H. Stenns (author) / F. Reinmuth (author) / L. Rouvel (author)
1983
250 pages
Report
No indication
English
Architectural Design & Environmental Engineering , Energy Use, Supply, & Demand , Heating & Cooling Systems , Buildings , Air Conditioning , Architecture , Economics , Energy Accounting , Energy Conservation , Energy Consumption , Heat Distribution Systems , Heat Recovery , Heating Systems , Humidity , Investment , Lighting Systems , Optimization , Planning , Residential Sector , Solar Energy , Space HVAC Systems , Sun Shades , Swimming Pools , Thermal Comfort , Thermal Insulation , Ventilation Systems , Waste Heat Utilization , Water Heating , Foreign technology , ERDA/320100 , ERDA/320600 , ERDA/291000
Anwendung der Erkenntnisse KREV an konkreten Bauvorhaben - KREV-A : Teilobjekt: Stiftung Liebenau
UB Braunschweig | 1983
|