A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Cedar Pond Dam (MA 00684), Thames River Basin, Sturbridge, Massachusetts. Phase 1 Inspection Report
The dam is a 340 ft. long, 9 ft. high earthfill dam. The dam is in fair condition. There are deficiencies which must be corrected. It has been classified as small in size with a significant hazard potential. (Author).
National Program for Inspection of Non-Federal Dams. Cedar Pond Dam (MA 00684), Thames River Basin, Sturbridge, Massachusetts. Phase 1 Inspection Report
The dam is a 340 ft. long, 9 ft. high earthfill dam. The dam is in fair condition. There are deficiencies which must be corrected. It has been classified as small in size with a significant hazard potential. (Author).
National Program for Inspection of Non-Federal Dams. Cedar Pond Dam (MA 00684), Thames River Basin, Sturbridge, Massachusetts. Phase 1 Inspection Report
1979
76 pages
Report
No indication
English