A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams, Merrimack Village Dam (NH 00115), Merrimack River Basin, Merrimack, New Hampshire. Phase I Inspection Report
The concrete dam is about 180 ft. long and is constructed on a circular arc. It is small in size with a low hazard potential classification. The dam is in fair condition. At the present time, there is no way to draw down the level of the reservoir. A program of annual technical inspections of the dam should be undertaken.
National Program for Inspection of Non-Federal Dams, Merrimack Village Dam (NH 00115), Merrimack River Basin, Merrimack, New Hampshire. Phase I Inspection Report
The concrete dam is about 180 ft. long and is constructed on a circular arc. It is small in size with a low hazard potential classification. The dam is in fair condition. At the present time, there is no way to draw down the level of the reservoir. A program of annual technical inspections of the dam should be undertaken.
National Program for Inspection of Non-Federal Dams, Merrimack Village Dam (NH 00115), Merrimack River Basin, Merrimack, New Hampshire. Phase I Inspection Report
1979
68 pages
Report
No indication
English