A platform for research: civil engineering, architecture and urbanism
National Dam Inspection Program. Mosquito Run Dam (NDI Number PA01012, PennDER Number 41-2), Susquehanna River Basin, Mosquito Creek, Lycoming County, Pennsylvania. Phase I Inspection Report
Mosquito Run Dam is owned by Williamsport Municipal Water Authority and is classified as a 'Significant' hazard - 'Small' size dam. The dam was found to be in good overall condition at the time of inspection. A spillway design flood (SDF) in the range of the 100-year flood to the 1/2 Probable Maximum Flood (1/2 PMF) is required for Mosquito Run Dam. Because the dam is on the low end of the 'Small' size category in terms of height and storage capacity, the 100-year flood was chosen as the SDF. Hydraulic/hydrologic evaluations, performed in accordance with procedures established by the Baltimore District Corps of Engineers, for Phase I Inspection Reports, revealed that the spillway capacity is greater than the inflow to the impoundment during the 100-year flood. The spillway is therefore considered 'Adequate.' The inspection revealed certain items of remedial work which should be performed by the owner without delay.
National Dam Inspection Program. Mosquito Run Dam (NDI Number PA01012, PennDER Number 41-2), Susquehanna River Basin, Mosquito Creek, Lycoming County, Pennsylvania. Phase I Inspection Report
Mosquito Run Dam is owned by Williamsport Municipal Water Authority and is classified as a 'Significant' hazard - 'Small' size dam. The dam was found to be in good overall condition at the time of inspection. A spillway design flood (SDF) in the range of the 100-year flood to the 1/2 Probable Maximum Flood (1/2 PMF) is required for Mosquito Run Dam. Because the dam is on the low end of the 'Small' size category in terms of height and storage capacity, the 100-year flood was chosen as the SDF. Hydraulic/hydrologic evaluations, performed in accordance with procedures established by the Baltimore District Corps of Engineers, for Phase I Inspection Reports, revealed that the spillway capacity is greater than the inflow to the impoundment during the 100-year flood. The spillway is therefore considered 'Adequate.' The inspection revealed certain items of remedial work which should be performed by the owner without delay.
National Dam Inspection Program. Mosquito Run Dam (NDI Number PA01012, PennDER Number 41-2), Susquehanna River Basin, Mosquito Creek, Lycoming County, Pennsylvania. Phase I Inspection Report
J. A. Dziubek (author)
1981
71 pages
Report
No indication
English