A platform for research: civil engineering, architecture and urbanism
Upper Guadalupe River Flood Control Weir, San Jose, California
Tests were conducted on a 1:36 scale model of a portion of the Guadalupe River. The study was designed to investigate the design of a control weir located at the upstream end of a bypass channel. The bypass channel was designed to pass excess flow and prevent flooding for river flows up to a 100- year event. The original weir design was modified to achieve desired flow distribution and control.
Upper Guadalupe River Flood Control Weir, San Jose, California
Tests were conducted on a 1:36 scale model of a portion of the Guadalupe River. The study was designed to investigate the design of a control weir located at the upstream end of a bypass channel. The bypass channel was designed to pass excess flow and prevent flooding for river flows up to a 100- year event. The original weir design was modified to achieve desired flow distribution and control.
Upper Guadalupe River Flood Control Weir, San Jose, California
B. D. Fuller (author)
2003
123 pages
Report
No indication
English
Roof-weir dam on guadalupe river, Texas
Engineering Index Backfile | 1932
|Hourly Water Temperature Modeling of the Guadalupe River, California
British Library Conference Proceedings | 1998
|Power development on Guadalupe River
Engineering Index Backfile | 1929
|