A platform for research: civil engineering, architecture and urbanism
Radial Gate Evaluation, Palo Verde Dam, Arizona-California
This summary of action items include: (1) Include hoist motor current draw readings as part of future gate testing and check brakes. Inspect wire ropes, connections, and equalizer bars when possible: (2) Inspect the exposed portions of the anchor bolts for pier anchore girder for signs of corrosion, and check that the nuts are tight: (3) Revise Standing Operating Procedures (excerpts in the appendix C) to reflect any current and recommended gate operation or maintenance procedures; and (4) Complete the Radial Gate Supplemental Data Sheet for the radial gate facility at this dam.
Radial Gate Evaluation, Palo Verde Dam, Arizona-California
This summary of action items include: (1) Include hoist motor current draw readings as part of future gate testing and check brakes. Inspect wire ropes, connections, and equalizer bars when possible: (2) Inspect the exposed portions of the anchor bolts for pier anchore girder for signs of corrosion, and check that the nuts are tight: (3) Revise Standing Operating Procedures (excerpts in the appendix C) to reflect any current and recommended gate operation or maintenance procedures; and (4) Complete the Radial Gate Supplemental Data Sheet for the radial gate facility at this dam.
Radial Gate Evaluation, Palo Verde Dam, Arizona-California
1997
54 pages
Report
No indication
English
Palo Verde Estates Subdivisions, Yuma, Arizona
NTIS | 1972
Palo Verde Estates Subdivisions, Yuma, Arizona
NTIS | 1972
NTIS | 1999
|Use of Extensometers at Palo Verde Nuclear Station
ASCE | 2021
|