National Program for Inspection of Non-Federal Dams. Muddy cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase 1 Inspection Report
Muddy Cove Pond Dam is approximately 985 feet long including the spillway and has a maximum height of approximately 32 feet. It consists of an embankment with riprap wave protection on the upstream face and a loamed and seeded crest and downstream face. The spillway is located approximately two thirds of the distance across the dam from the left abutment. The facility is considered in good condition. There are no obvious signs of impending failure or conditions which would warrant urgent remedial measures. The estimated test flood stage is about 2.7 feet below the spillway abutments. An investigation is recommended to evaluate the observed seepage at the toe of the dam embankment. Recommended remedial measures include the removal of brush from riprap and along spillway walls, restoration of eroded areas along spillway walls and gatehouse, filling of animal burrows, the monitoring of riprap erosion and seepage at embankment toe, and maintenance of the gatehouse door and reservoir sluice gate.
National Program for Inspection of Non-Federal Dams. Muddy cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase 1 Inspection Report
Muddy Cove Pond Dam is approximately 985 feet long including the spillway and has a maximum height of approximately 32 feet. It consists of an embankment with riprap wave protection on the upstream face and a loamed and seeded crest and downstream face. The spillway is located approximately two thirds of the distance across the dam from the left abutment. The facility is considered in good condition. There are no obvious signs of impending failure or conditions which would warrant urgent remedial measures. The estimated test flood stage is about 2.7 feet below the spillway abutments. An investigation is recommended to evaluate the observed seepage at the toe of the dam embankment. Recommended remedial measures include the removal of brush from riprap and along spillway walls, restoration of eroded areas along spillway walls and gatehouse, filling of animal burrows, the monitoring of riprap erosion and seepage at embankment toe, and maintenance of the gatehouse door and reservoir sluice gate.
National Program for Inspection of Non-Federal Dams. Muddy cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase 1 Inspection Report
1979
75 pages
Report
No indication
English
Civil Engineering , Earth dams , Erosion , Animals , Filling , Tunnels , Massachusetts , Embankments , Seepage , Protection , Waves , Failure , Dams , Inspection , Spillways , Walls , Visual inspection , Safety , Flooding , Hazards , Deficiencies , Muddy Cove Pond Dam , National Dam Inspection Program