Partial Construction Report of a Bonded Concrete Overlay on IH-10, El Paso, and Guide for Expedited Bonded Concrete Overlay Design and Construction
Expedited bonded concrete overlays offer an economical alternative to rehabilitating concrete pavements. The construction of a bonded concrete overlay in El Paso has provided the opportunity to research pavement design, mix design, construction methods, and specification development for use in future overlay construction. This report documents the valuable information collected during the construction of the bonded concrete overlay on IH-10 in El Paso. Although this project did not proceed as an expedited overlay, it was planned and researched as such. Unfortunately, a combination of factors led to delamination in some areas of the overlay. This report identifies the causes of these delaminations that occurred during this construction and makes recommendations for future overlay construction. Project selection, design, construction, and quality control are addressed in an included guide for expedited bonded concrete overlays. Also addressed is the scheduling of the construction in such a way as to avoid marginal or severe environmental conditions. The methods presented in this report may be used to construct bonded concrete overlays that can be opened to traffic 12 to 24 hours after concrete placement.
Partial Construction Report of a Bonded Concrete Overlay on IH-10, El Paso, and Guide for Expedited Bonded Concrete Overlay Design and Construction
Expedited bonded concrete overlays offer an economical alternative to rehabilitating concrete pavements. The construction of a bonded concrete overlay in El Paso has provided the opportunity to research pavement design, mix design, construction methods, and specification development for use in future overlay construction. This report documents the valuable information collected during the construction of the bonded concrete overlay on IH-10 in El Paso. Although this project did not proceed as an expedited overlay, it was planned and researched as such. Unfortunately, a combination of factors led to delamination in some areas of the overlay. This report identifies the causes of these delaminations that occurred during this construction and makes recommendations for future overlay construction. Project selection, design, construction, and quality control are addressed in an included guide for expedited bonded concrete overlays. Also addressed is the scheduling of the construction in such a way as to avoid marginal or severe environmental conditions. The methods presented in this report may be used to construct bonded concrete overlays that can be opened to traffic 12 to 24 hours after concrete placement.
Partial Construction Report of a Bonded Concrete Overlay on IH-10, El Paso, and Guide for Expedited Bonded Concrete Overlay Design and Construction
N. J. Delatte (author) / S. F. Graeter (author) / M. Trevino-Frias (author) / D. W. Fowler (author) / B. F. McCullough (author)
1996
74 pages
Report
No indication
English
Design and Construction of a Bonded Fiber Concrete Overlay of CRCP
British Library Conference Proceedings | 1996
|Performance evaluation of bonded concrete overlay
Elsevier | 2013
|Experimental Thin-Bonded Concrete Overlay Pavement
NTIS | 1985
|