A platform for research: civil engineering, architecture and urbanism
Pavement Performance Evaluation, Phase II-Data Collection. Final Report
Phase I and II of this study tested approximately 1500 rehabilitated pavements (asphalt and PCC) throughout the State. These pavements ranged from 5 to 15 years old and were intended to develop a snapshot of how various rehabilitations were performing. Data for each site consisted of office data (asbuilts), field testing (FWD, distress and coring) and laboratory testing (Rice, gradation, etc.). Data was provided in an Access database. Indices were created for structural, roughness and distress as an evaluation tool to compare sections. Initial analyses using these indices were made on RAP and RAC sections throughout the State which showed that the data provides a basis for comparing strategies.
Pavement Performance Evaluation, Phase II-Data Collection. Final Report
Phase I and II of this study tested approximately 1500 rehabilitated pavements (asphalt and PCC) throughout the State. These pavements ranged from 5 to 15 years old and were intended to develop a snapshot of how various rehabilitations were performing. Data for each site consisted of office data (asbuilts), field testing (FWD, distress and coring) and laboratory testing (Rice, gradation, etc.). Data was provided in an Access database. Indices were created for structural, roughness and distress as an evaluation tool to compare sections. Initial analyses using these indices were made on RAP and RAC sections throughout the State which showed that the data provides a basis for comparing strategies.
Pavement Performance Evaluation, Phase II-Data Collection. Final Report
S. Zaghloul (author)
2008
191 pages
Report
No indication
English
Pavement Testing Facility. Phase 1 Final Report
NTIS | 1993
|Pavement Subbases. Final Report
NTIS | 1991
|Pavement response, evaluation, and data collection
UB Braunschweig | 1986
|Pavement response, evaluation, and data collection
TIBKAT | 1986
|