A platform for research: civil engineering, architecture and urbanism
The objective of this research is to provide the implementation roadmaps for the recommendations proposed in Phase I to enhance the capability and robustness of the current waterproofing system in District 10-0 of PennDOT. Built upon the results obtained in the numerical simulations and experimental characterizations, the research team developed the necessary implementation guidance for practice. The developed implementation roadmaps include improving the design of abutment/beam adjunction, using crystalline waterstops for construction joints and old-new concrete interfaces, building an overlap in the waterproofing membrane to mitigate the delamination risk at the location of beam seat, reinforcing elastomeric concrete to produce stronger and more durable header materials for expansion joints, and designing a sensoring system to monitor the movement of expansion joints as well as to detect the water leakage.
The objective of this research is to provide the implementation roadmaps for the recommendations proposed in Phase I to enhance the capability and robustness of the current waterproofing system in District 10-0 of PennDOT. Built upon the results obtained in the numerical simulations and experimental characterizations, the research team developed the necessary implementation guidance for practice. The developed implementation roadmaps include improving the design of abutment/beam adjunction, using crystalline waterstops for construction joints and old-new concrete interfaces, building an overlap in the waterproofing membrane to mitigate the delamination risk at the location of beam seat, reinforcing elastomeric concrete to produce stronger and more durable header materials for expansion joints, and designing a sensoring system to monitor the movement of expansion joints as well as to detect the water leakage.
Bridge Waterproofing Details - Phase 2
Q. Yu (author)
2017
122 pages
Report
No indication
English
BRIDGE COATING WATERPROOF STRUCTURE BRIDGE COATING WATERPROOFING AND BRIDGE WATERPROOFING METHOD
European Patent Office | 2020
|British Library Online Contents | 1996
Engineering Index Backfile | 1908
European Patent Office | 2024
|BRIDGE DECK WATERPROOFING STRUCTURE AND BRIDGE DECK WATERPROOFING CONSTRUCTION METHOD
European Patent Office | 2024
|