A platform for research: civil engineering, architecture and urbanism
Record of Decision. Folsom Dam Safety and Flood Damage Reduction Joint Federal Project
This document is the joint Record of Decision (ROD) of the United States Department of the Interior, Bureau of Reclamation (Reclamation), Mid-Pacific Region, the lead federal agency, and the Department of the Army, Office of the Secretary of the Army (Civil Works) (Corps), cooperating federal agency, for the Folsom Dam Safety and Flood Damage Reduction (DS/FDR) action. Both agencies have reviewed the Folsom DS/FDR Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) (DES-06-53, State Clearing House No. 2006022091) dated December 2006 and Final EIS/EIR (FES-07-10) dated March 2007, addressing dam safety and flood damage reduction components of the Folsom DS/FDR actions at Folsom, California. The EIS/EIR was developed in compliance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Corps has developed separately the American River Watershed Project/Folsom Modifications Post Authorization Change (PAC) Report addressing flood damage reduction issues for the watershed. This ROD is consistent with the PAC Report presentation of issues.
Record of Decision. Folsom Dam Safety and Flood Damage Reduction Joint Federal Project
This document is the joint Record of Decision (ROD) of the United States Department of the Interior, Bureau of Reclamation (Reclamation), Mid-Pacific Region, the lead federal agency, and the Department of the Army, Office of the Secretary of the Army (Civil Works) (Corps), cooperating federal agency, for the Folsom Dam Safety and Flood Damage Reduction (DS/FDR) action. Both agencies have reviewed the Folsom DS/FDR Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) (DES-06-53, State Clearing House No. 2006022091) dated December 2006 and Final EIS/EIR (FES-07-10) dated March 2007, addressing dam safety and flood damage reduction components of the Folsom DS/FDR actions at Folsom, California. The EIS/EIR was developed in compliance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Corps has developed separately the American River Watershed Project/Folsom Modifications Post Authorization Change (PAC) Report addressing flood damage reduction issues for the watershed. This ROD is consistent with the PAC Report presentation of issues.
Record of Decision. Folsom Dam Safety and Flood Damage Reduction Joint Federal Project
2007
57 pages
Report
No indication
English
Hydrology & Limnology , Civil Engineering , Water Pollution & Control , Dams , Floods , Safety , Compliance , Damage control , Reduction , Hydrology , Water quality , Ground water , Watersheds , Natural resources , Aquatic ecosystems , Soils , Geology , Cultural resources , Land use , California , Recreation , Rivers , Water supply , Agriculture , Statutes , Folsom Dam , Record of Decision , Joint Federal Project (JFP)
Eliminating Cavitation, Erosion Damage at Folsom Dam
British Library Online Contents | 1999
|