A platform for research: civil engineering, architecture and urbanism
Dewatering Active Underground Coal Mines. Technical Aspects and Cost-Effectiveness
This study evaluated the cost-effectiveness of dewatering an active underground coal mine as an alternative or supplement to treating acid mine drainage. A dewatering program was formulated and base-line data collection was performed in conjunction with exploration of hydrogeologic conditions and well construction. Dewatering was then performed for a total of 25 days to provide the basis for the technical and cost analysis.
Dewatering Active Underground Coal Mines. Technical Aspects and Cost-Effectiveness
This study evaluated the cost-effectiveness of dewatering an active underground coal mine as an alternative or supplement to treating acid mine drainage. A dewatering program was formulated and base-line data collection was performed in conjunction with exploration of hydrogeologic conditions and well construction. Dewatering was then performed for a total of 25 days to provide the basis for the technical and cost analysis.
Dewatering Active Underground Coal Mines. Technical Aspects and Cost-Effectiveness
1979
140 pages
Report
No indication
English
Noise in Underground Coal Mines
NTIS | 1971
|Floor design in underground coal mines
Online Contents | 1989
|Floor design in underground coal mines
Springer Verlag | 1989
|