A platform for research: civil engineering, architecture and urbanism
Traffic Management in Highway Work Zones and Setting Optimal Maintenance Levels and Rehabilitation Frequencies
The 11 papers in the report deal with the following areas: decision in selection of maintenance levels of service; bridge deck rehabilitation decision making; setting maintenance levels for aggregate surface roads; optimal rehabilitation frequencies for highway pavements; flow characteristics at freeway lane closures; operational and safety impacts on freeway traffic of high-occupancy vehicle lane construction in a median; field evaluation of work zone speed control techniques; selection of work zone channelizing devices using the value engineering approach; potential impact of speed reduction at freeway lane closures; a imulation study; guidelines for positive barrier use in construction zones.
Traffic Management in Highway Work Zones and Setting Optimal Maintenance Levels and Rehabilitation Frequencies
The 11 papers in the report deal with the following areas: decision in selection of maintenance levels of service; bridge deck rehabilitation decision making; setting maintenance levels for aggregate surface roads; optimal rehabilitation frequencies for highway pavements; flow characteristics at freeway lane closures; operational and safety impacts on freeway traffic of high-occupancy vehicle lane construction in a median; field evaluation of work zone speed control techniques; selection of work zone channelizing devices using the value engineering approach; potential impact of speed reduction at freeway lane closures; a imulation study; guidelines for positive barrier use in construction zones.
Traffic Management in Highway Work Zones and Setting Optimal Maintenance Levels and Rehabilitation Frequencies
R. B. Kulkarni (author) / C. J. Van Til (author) / P. D. Cady (author) / B. C. Butler (author) / R. Harrison (author)
1985
102 pages
Report
No indication
English
Optimal Trade-Offs between Construction Cost and Traffic Delay for Highway Work Zones
Online Contents | 2016
|Optimal Trade-Offs between Construction Cost and Traffic Delay for Highway Work Zones
Online Contents | 2016
|