A platform for research: civil engineering, architecture and urbanism
Remaining Life Assessment of In-Service Luminaire Support Structures
The primary objective of this research is to provide recommendations for prioritizing inspection and replacement of luminaire support structures. To this end, the remaining fatigue life of in-service luminaire support structures was investigated through a comprehensive literature review, study of typical support structures in Washington State, and fatigue testing of two previously in service luminaire support structures.
Remaining Life Assessment of In-Service Luminaire Support Structures
The primary objective of this research is to provide recommendations for prioritizing inspection and replacement of luminaire support structures. To this end, the remaining fatigue life of in-service luminaire support structures was investigated through a comprehensive literature review, study of typical support structures in Washington State, and fatigue testing of two previously in service luminaire support structures.
Remaining Life Assessment of In-Service Luminaire Support Structures
M. C. Frymoyer (author) / J. W. Berman (author)
2009
197 pages
Report
No indication
English
Assessment of Remaining Life of High-Mast Luminaire Structures
British Library Conference Proceedings | 2019
|Remaining service life of FRP rehabilitated structures
Tema Archive | 2004
|Computer solution of luminaire support structures
Engineering Index Backfile | 1968
|Damage Assessment and Remaining Life Prediction for Structures
British Library Conference Proceedings | 1993
|